[Isocops] IBEX Orbit #509 ATS Approval (28 Nov 20 - 7 Dec 20)

Nigel Angold angoldconsulting at earthlink.net
Sun Nov 15 11:46:44 EST 2020


I approve IBEX_2020_332_o0509a_BUS_v001.scr and IBEX_2020_332_o0509a_INST_v001.scr for uplink during this evening’s apogee contact.

Nigel

> All,
>    Attached are the planning files for Orbit #509
> Please respond to this thread with comments and approvals.  
> Approvals are required by COB on 15 November 2020
>  
> Please note the following:
> I generated 3 separate ATS files BUS, INST and a complete file. The BUS and INST will be the files to be uplinked. The complete ATS, I used as a sanity check to see how the commands lined up. Since we are in a new phase of ATS generation. IF you have any ideas of doing this differently, let me know.
>  
> The 3 ATS files have been changed to word files and encrypted. I will send out another email with the password. The files that have been transferred via MFT have not been encrypted and are still text files.  
>  
> I moved the 2 House Keeping commands from the INST ATS to the BUS ATS. I commented out the 2 commands in the INST ATS. If for some reason we were unable to uplink the INST Commands for this orbit, we would have been in the wrong spacecraft state for executing the maneuver commands. 
>  
> 4.       To reduce the number hand edits in an ATS. I am incorporating the use of an ABS file for inserting both battery balancing and 18 day timer reset commands.
>  
> Battery Balancing this orbit
> # Orbit 509 Battery Balancing 
> # 2020-12-06T17:31:16.958Z,Perigee,orbit:509 
> Begin 2020/12:06:17:00:00 – End 2020/12:06:18:30:00
>  
> 6.       # Orbit# 507 Reset Master Timer  2020/11:19:00:15:00
>  
> 7.       Command Load Constraint Violation Report (CCVR)
> The 2 IBX-CLC-006 Soft constraint violations are because the following contacts closer than 5 hours in separation. This is acceptable since there is 1.5 hour separation between the 2 contacts and power and temperature will not be an issue.
> IBEX,USHI01,ADD,12/06/20,341,05:30:00,12/06/20,341,06:30:00,LAHO 64K IBEX-2 Orbit# 509 Lo ISN Sweep Begin Contact 15.5 Desc
> IBEX,USHI01,ADD,12/06/20,341,08:00:00,12/06/20,341,09:00:00,LAHO 160K IBEX-2 Orbit# 509 SSR_Dump/Tracking Contact 14 Desc
> IBEX_2020_332_o0509a_v001.ccvr
> # Input files:         1
> #   IBEX_2020_332_o0509a_v001.scr
>  
> ==========================
> HARD CONSTRAINT VIOLATIONS
> ==========================
> NO VIOLATIONS.
>  
> ==========================
> SOFT CONSTRAINT VIOLATIONS
> ==========================
> IBX-CLC-006: Planned transmission at 2020/12/06 05:28:00 UTC - 2020/12/06
>              06:32:00 UTC is followed by one or more additional transmissions
>              which, when combined, exceed the maximum transmission time of 5400
>              seconds within a 18000-second window (total planned transmission
>              time this window is 7680.000 seconds)
> IBX-CLC-006: Planned transmission at 2020/12/06 07:58:00 UTC - 2020/12/06
>              09:02:00 UTC is preceded by one or more additional transmissions
>              which, when combined, exceed the maximum transmission time of 5400
>              seconds within a 18000-second window (total planned transmission
>              time this window is 7680.000 seconds)
> IBX-CLC-016: No command to enable spin pulse protection was found after
>              transition to science mode at 2020/11/27 23:40:32 UTC
> IBX-CLC-016: No command to enable spin pulse protection was found after
>              transition to science mode at 2020/12/02 10:48:41 UTC
>  
> ==============
> OTHER MESSAGES
> ==============
> NO MESSAGES.
>  
> Timothy E.Perry
> CRS IBEX OCO-2
> Mission Operations
> timothy.perry at ngc.com <mailto:timothy.perry at ngc.com>
> Office (703) 406-5976
> Cell (301) 606-1430
>  
> <image001.png>
>  
>  
> <IBEX_2020_332_o0509a_v001.docx><IBEX_2020_332_o0509a_INST_v001.docx><IBEX_2020_332_o0509a_BUS_v001.docx><IBEX_2020_332_o0509a_v001.ccvr><IBEX_2020_332_o0509a_BUS_v001.ccvr><IBEX_2020_332_o0509a_INST_v001.ccvr><IBEX_2020_332_o0509a_BUS_v001.oef><IBEX_2020_332_o0509a_INST_v001.oef><IBEX_Orbit509_Contacts.txt><IBEX-Command-Approval-Checklist-Rev16_F_509_TEP.docx>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20201115/d40e416b/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16g-o509-nga.ngpdf
Type: application/octet-stream
Size: 163719 bytes
Desc: not available
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20201115/d40e416b/IBEX-Command-Approval-Checklist-Rev16g-o509-nga-0001.ngpdf>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20201115/d40e416b/attachment-0003.html>


More information about the Isocops mailing list