[Isocops] IBEX ORbit# 329 ATS Approval (4 June 16 - 14 June 16)

Reno, Michelle mreno at swri.edu
Wed May 25 20:27:43 EDT 2016


I approve IBEX_2016_156_o0329a_v001.scr



--
Chelle Reno
IBEX Mission Operations Manager
Juno/JADE Deputy Project Manager
Austin Mission Consulting
(210) 478-7337
________________________________
From: Wesley.Sheral [sheral.wesley at orbitalatk.com]
Sent: Tuesday, May 24, 2016 6:43 PM
To: David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Lockwood.Robert; Reno, Michelle; Nigel Angold; Paul Janzen; Perry.Tim; Tyler.Ryan; Wesley.Sheral
Subject: IBEX ORbit# 329 ATS Approval (4 June 16 - 14 June 16)

Guys,
Here are the planning files and ATS for Orbit# 329.
Please respond to this email thread with your comments/questions and approvals.
Approvals are required before 26 May 16 @1200 UTC

Note the following:

1.       New IBEX Rote Change : % valid thresholds after inertial maneuver
% valid command is now: ACT_SetKFInputSelect STA_PCT_VALID,43,28,33,48


2.       No ACT_SetSpinPulseProtectEnable commands

3.       No Battery Balancing Commands

4.       Moon in Lo FOV Commands
2016-06-11T23:13:15.986Z,MoonInLoFovStart,orbit:329
2016-06-12T22:58:19.195Z,MoonInLoFovStop,orbit:329


5.       Command Load Constraint Violation Report
IBEX_2016_156_o0329a_v001.scr

==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.

==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/06/14 03:43:00 UTC - 2016/06/14
             05:17:00 UTC exceeds the maximum contiguous transmission time of
             5400 seconds
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2016/06/05 08:45:16 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2016/06/09 06:54:03 UTC

==============
OTHER MESSAGES
==============
NO MESSAGES.



Sheral  R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2   Room 1337
Office (703) 406-5641
Cell (202) 236-0802
[cid:image001.jpg at 01D04F6C.5A1C97F0]

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160526/465992e2/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 2392 bytes
Desc: image001.jpg
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160526/465992e2/image001-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16-o0329-cr.pdf
Type: application/pdf
Size: 108086 bytes
Desc: IBEX-Command-Approval-Checklist-Rev16-o0329-cr.pdf
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160526/465992e2/IBEX-Command-Approval-Checklist-Rev16-o0329-cr-0001.pdf>


More information about the Isocops mailing list