[Isocops] IBEX Orbit# 327 ATS Approval (17 May 16 - 26 May 16)

Reno, Michelle mreno at swri.edu
Fri May 6 13:27:38 EDT 2016


I approve IBEX_2016_138_o0327a_Recovery_v001.scr.



As Ken noted, the stx off command from the last orbit 326 command is after the Enter Science State commands of 327 but neither of us see a conflict with the command timing.



Chelle



--
Chelle Reno
IBEX Mission Operations Manager
Juno/JADE Deputy Project Manager
Austin Mission Consulting
(210) 478-7337
________________________________
From: Wesley.Sheral [sheral.wesley at orbitalatk.com]
Sent: Wednesday, May 04, 2016 5:44 PM
To: David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Lockwood.Robert; Reno, Michelle; Nigel Angold; Paul Janzen; Perry.Tim; Tyler.Ryan; Wesley.Sheral
Subject: IBEX Orbit# 327 ATS Approval (17 May 16 - 26 May 16)

Guys,
Here are the planning files and ATS for Orbit# 327.
Please respond to this email thread with your comments and approvals
Approvals are required before 6 May 16 @ 1800 UTC

Note the following:

1.       No ACT_SetSpinPulseProtectEnable Enable commands


2.       Battery Balancing at PERIGEE
2016-05-26T18:20:00.446Z,Perigee,orbit:327
SetLongEclipseFlag TRUE $TIME=2016/05:26:18:00:00
SetLongEclipseFlag FALSE $TIME=2016/05:26:19:30:00


3.       IBEX_Hi Gain Test
Orbit# 327 APOGEE: IBEX_Hi Gain Test (05:23:04:00:36 - 05:23:08:15:41)


4.       Command Load Constraint Violation Report
IBEX_2016_138_o0327a_Recovery_v001.scr

==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.

==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/05/22 11:58:00 UTC - 2016/05/22
             13:02:00 UTC is followed by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2016/05/22 14:58:00 UTC - 2016/05/22
             16:02:00 UTC is preceded by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2016/05/26 23:58:00 UTC - 2016/05/27
             01:02:00 UTC is followed by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2016/05/27 01:58:00 UTC - 2016/05/27
             03:02:00 UTC is preceded by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2016/05/17 21:43:26 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2016/05/22 05:08:04 UTC

*The contacts are extended to gather CSS Telemetry and set the CEU Spin Period*
* no ACT_SetSpinPulseProtectEnable Enable commands*
==============
OTHER MESSAGES
==============
NO MESSAGES.



Sheral  R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2   Room 1337
Office (703) 406-5641
Cell (202) 236-0802
[cid:image001.jpg at 01D04F6C.5A1C97F0]

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160506/740d9f6e/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 2392 bytes
Desc: image001.jpg
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160506/740d9f6e/image001-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev15-o0327-cr.pdf
Type: application/pdf
Size: 107279 bytes
Desc: IBEX-Command-Approval-Checklist-Rev15-o0327-cr.pdf
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20160506/740d9f6e/IBEX-Command-Approval-Checklist-Rev15-o0327-cr-0001.pdf>