[Isocops] IBEX Orbit# 246 ATS (11 May 14 - 20 May 14)

Reno, Michelle mreno at swri.edu
Thu May 1 12:05:00 EDT 2014


I approve IBEX_2014_131_o0246a_v001.scr

Ken, Why does the transition to Housekeeping occur 30 minutes before 14 Re descending in this orbit? The maneuver is not until 13 Re descending so the state transition can occur at 14 Re and still keep the 1 hour minimum before the burn.

--
Chelle Reno
IBEX Mission Operations Manager
Juno/JADE Deputy Project Manager
Austin Mission Consulting
(210) 478-7337
________________________________
From: Ibex Mission Operations [ibexops at gmail.com]
Sent: Monday, April 28, 2014 11:16 AM
To: Harold Kucharek; IBEX FDG; ISOC at New Hampshire; Ken Fairchild; Reno, Michelle; Nigel Angold; Paul Janzen; Robert Lockwood; Ryan Tyler; Sheral Wesley; Tim Perry
Subject: IBEX Orbit# 246 ATS (11 May 14 - 20 May 14)

Guys,
    Here are the planning files and ATS for Orbit# 246.
Please respond to this email thread with your comments and ATS approvals.
All approvals are required before 1 May 14 @1200 UTC

Please note the following:
1. No battery balancing commands this orbit
2. Special Ops/Post-LUT Changes
Hi negative collimator voltage set to 1400
Hi ABAB (CEM comparison)
3. Command Load Constraint Violation Report (CCVR)
IBEX_2014_131_o0246a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==============
OTHER MESSAGES
==============
NO MESSAGES.





--
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
CYGNUS Mission Planning
(304) 279-6678
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140501/9a6fc538/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev13b-o0246-cr.pdf
Type: application/pdf
Size: 109910 bytes
Desc: IBEX-Command-Approval-Checklist-Rev13b-o0246-cr.pdf
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140501/9a6fc538/IBEX-Command-Approval-Checklist-Rev13b-o0246-cr-0001.pdf 


More information about the Isocops mailing list