[Isocops] IBEX Orbit# 204 ATS (25 Apr 13 - 4 May 13)

Nigel Angold ngangold at earthlink.net
Mon Apr 15 18:29:33 EDT 2013


Here's the fully approved Sun Maneuver Checklist.

Nigel

-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Sun-Maneuver-Checklist-Rev8-o204-1.pdf
Type: application/pdf
Size: 165984 bytes
Desc: not available
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20130415/dd26412c/IBEX-Sun-Maneuver-Checklist-Rev8-o204-1-0001.pdf 
-------------- next part --------------


> Guys,
>     Here are the planning files and ATS for Orbit# 204 (25 Apr 13 - 4 May 13)
> Please respond to this email thread with your comments/approvals.  All comments/approvals are required before 15 Apr 13 @1800 UTC
>  
> Note the following:
> 1. No Battery Balancing commands
> 2. Only two contacts
> 3. Sun Maneuver at APOGEE
>   -The star tracker outage started at 14_re Desc in Orbit# 203
> 2013-04-24T20:00:00.000Z,StarTrackerOutageStart,orbit:203,dueTo:moon
> 2013-04-30T17:52:58.114Z,StarTrackerOutageStop,orbit:204,dueTo:moon
> 4. Moderate Eclipse commands will start in ORbit# 205 ATS
> 2013-05-04T19:45:49.816Z,PenumbraEntry,orbit:204
> 2013-05-04T19:45:49.816Z,EclipseEntry,orbit:204,moderate:true,long:false
>  
> 2013-05-04T20:52:24.206Z,PenumbraExit,orbit:204
> 2013-05-04T20:52:24.206Z,EclipseExit,orbit:204,moderate:true,long:false
>  
> 5. Command Load Constraint Violation Report (CCVR)
>  #   IBEX_2013_115_o0204a_v001.scr
> ==========================
> HARD CONSTRAINT VIOLATIONS
> ==========================
> NO VIOLATIONS.
> ==========================
> SOFT CONSTRAINT VIOLATIONS
> ==========================
> NO VIOLATIONS.
> ==============
> OTHER MESSAGES
> ==============
> NO MESSAGES.
> 
> 
> -- 
> Sheral R. Wesley
> SPVR., Satellite Operations
> IBEX Mission OPS
> (304) 279-6678
> <IBEX_2013_115_o0204a_v001.txt><IBEX_2013_115_o0204a_v001.ccvr><IBEX_2013_115_o0204a_v001.oef><IBEX_Orbit204Contacts.txt>



More information about the Isocops mailing list