[Isocops] IBEX Orbit # 172 and #173 Ibex_Lo Commands

Reno, Michelle mreno at swri.edu
Wed Jul 11 16:39:35 EDT 2012


I approve the Lo recovery ATSs.
 
Hey Harald,
 
There is actually some time allotted between the commands because the timing I used is the same timing as is in the macro. There is enough time allotted to ramp between  12 and 16 kV in the macros but we are only ramping between 10 and 12 kV here. You can assume half of the time between the PAC and MCP ramp is spent ramping and half is spent dwelling.
 
Let me know ASAP if you need the timing increased more.

 
 
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Chelle Reno
Austin Mission Consulting
(210) 478-7337 (c)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~

________________________________

From: Harald Kucharek [mailto:harald.kucharek at unh.edu]
Sent: Wed 7/11/2012 3:27 PM
To: Reno, Michelle; Ibex Mission Operations; Eberhard Moebius; Bret Hautamaki; IBEX-FDG; IBEXOPS/ORB; ISOC at New Hampshire; John Cavallo; Tapley, Mark; Robert Lockwood; Roland Vanderspek; Ryan Tyler; Sheral Wesley; Thomas Regiec; Tim Perry; Walker Cross; David Heirtzler; paul.janzen at umontana.edu; Dunn, Greg; eberhard.moebius at unh.edu; Fuselier, Stephen
Subject: Re: [Isocops] IBEX Orbit # 172 and #173 Ibex_Lo Commands


Hi Chelle,

I approve the STF for IBEX-lo. But, I would propose to leave one or two minutes between ramping the PAC and ramping the MCP up/down. This would allow the PAC voltage/current to settle. This is a suggestion, no condition.

Best regards,
Harald
 


On 7/11/12 11:54 AM, "Reno, Michelle" <mreno at swri.edu> wrote:



	Approvals needed by 5pm EDT today. MOC, ISOC (Ken), Lo, Hi, CEU. Since this was a manual STF generation I want many eyes on it, in case anything was overlooked in the STF approval phase.
	
	Thanks Sheral!
	
	
________________________________

	From: isocops-bounces at lists.sr.unh.edu on behalf of Ibex Mission Operations
	Sent: Wed 7/11/2012 10:29 AM
	To: Eberhard Moebius; Bret Hautamaki; IBEX-FDG; IBEXOPS/ORB; ISOC at New Hampshire; John Cavallo; Tapley, Mark; Robert Lockwood; Roland Vanderspek; Ryan Tyler; Sheral Wesley; Thomas Regiec; Tim Perry; Walker Cross; David Heirtzler
	Subject: [Isocops] IBEX Orbit # 172 and #173 Ibex_Lo Commands
	
	Guys,
	    Here are the command loads for IBEX_Lo during Orbits #172 and #173
	 
	The errors contained with the CCVR's are normal because we did not build a complete command load.
	The Lo commands were built using OEF files from the corresponding Orbits.
	
	



-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20120711/b96ae18d/attachment.html 


More information about the Isocops mailing list