[Isocops] Command Approval Checklist Rev 8

Tim Perry Perry.Tim at orbital.com
Mon Jan 23 10:14:14 EST 2012


I do have a couple comments. I don't mind a few more rules. I think we 
need to discuss the rules a little more. 
Contacts - How long should we wait until we schedule a contact pre & post 
eclipse?
Maneuvers - Should there be a minimum time Pre or Post eclipse before we 
plan the maneuver? 
Science collection - What steps should we take for the instrument? 
 Just a couple thoughts. 


Timothy E. Perry
IBEX & GEMS Mission Ops Lead
Orbital Sciences Corp
Space Systems Group
Office: (703) 406-5976
Cell: (301) 606-1430
perry.tim at orbital.com



From:   "Reno, Michelle" <mreno at swri.edu>
To:     "Ibex Mission Operations" <ibexops at gmail.com>, "Bret Hautamaki" 
<hautamaki.bret at orbital.com>, "IBEX-FDG" <IBEX.fdg at applieddefense.com>, 
"IBEXOPS/ORB" <IBEXops at orbital.com>, "ISOC at New Hampshire" 
<isocops at lists.sr.unh.edu>, "John Cavallo" <cavallo.john at orbital.com>, 
"Tapley, Mark" <mtapley at swri.edu>, "Robert Lockwood" 
<Lockwood.Robert at orbital.com>, "Roland Vanderspek" <roland at space.mit.edu>, 
"Ryan Tyler" <tyler.ryan at orbital.com>, "Sheral Wesley" 
<wesley.sheral at orbital.com>, "Thomas Regiec" <regiec.thomas at orbital.com>, 
"Tim Perry" <perry.tim at orbital.com>, "Walker Cross" 
<Cross.Walker at orbital.com>
Date:   01/19/2012 03:17 PM
Subject:        Command Approval Checklist Rev 8



Hi All,
 
Attached is Rev 8 of the command approval checklist. It has been modified 
to verify no contacts or maneuvers occur during an eclipse, per Ryan. 
Comments/changes welcome.
 
Changes from Rev 7a:
was 7a:
Special Op
this orbit?
 
 
15Re desc
Date/Time
 
10Re desc
Date/Time
 
is 8:
15Re desc
Date/Time
 
 
10Re desc
Date/Time
 
10Re asc
Date/Time
 
 
was 7a:
Contact Commands
·         Each contact has 5 commands
1.     Verify STX on/off times, downlink rate against Orbit_oXXX.txt file
2.     Verify contacts in the previous ATS have not been duplicated 
3.     Verify all currently planned contacts in Orbit_xxx.txt are in the 
ATS.
4.     Verify each contact contains the following 5 commands
·         SetRelay stx,on 
·         SetDownlink2K  (2K, 40K, 64K, 160K, or 320K)
·         SetBilevelOutputControlReg STXMODE_Strobe,ON 
·         SetBilevelOutputControlReg COHERENT,ON 
·         SetRelay stx,off 
5.        Verify contact is not during an eclipse.
6.        If an APL contact is being used for an SSR Dump, the data rate 
should be at least 160 ksps & the SSR Dump New command should be included 
in the contact commands : 
·         SetRelay stx,on
·         SetDownlink160K
·         SetBilevelOutputControlReg STXMODE_Strobe,ON
·         SetBilevelOutputControlReg COHERENT,ON 
·         SSR_DUMP_NEW 
·         SetRelay stx,off 
is 8:
Contact Commands
·         Each contact has 5 commands
1.     Verify STX on/off times, downlink rate against Orbit_oXXX.txt file
2.     Verify contacts in the previous ATS have not been duplicated 
3.     Verify all currently planned contacts in Orbit_xxx.txt are in the 
ATS.
4.     Verify each contact contains the following 5 commands
·         SetRelay stx,on 
·         SetDownlink2K  (2K, 40K, 64K, 160K, or 320K)
·         SetBilevelOutputControlReg STXMODE_Strobe,ON 
·         SetBilevelOutputControlReg COHERENT,ON 
·         SetRelay stx,off 
5.        Verify contact is not during an eclipse.
6.        If an APL contact is being used for an SSR Dump, the data rate 
should be at least 160 ksps & the SSR Dump New command should be included 
in the contact commands : 
·         SetRelay stx,on
·         SetDownlink160K
·         SetBilevelOutputControlReg STXMODE_Strobe,ON
·         SetBilevelOutputControlReg COHERENT,ON 
·         SSR_DUMP_NEW 
·         SetRelay stx,off 
 
was 7a: N/A
is 8:
Eclipse Check
1.     Check OEF for eclipses during the orbit.
2.     Verify no contacts planned during an eclipse.
3.     Verify no maneuver planned during an eclipse.
This applies to all eclipses, not just moderate or long eclipses.
 
 
 
was 7a:
Inertial Maneuver Commands : Apogee
1.     Payload DESCENDING commands occur 1.5h before thruster enable.
·            DESCENDING_PL2 
2.     Spacecraft Housekeeping command occur 1h before thruster enable.
·         SetScState housekeeping 
3.     Verify Thruster enable command occurs within STF maneuver window.
4.     Verify cat bed heaters come on 55 min before burn
...
is 8:
Maneuver Commands : Apogee
1. Payload DESCENDING commands occur 1.5h before thruster enable.
· DESCENDING_PL2 
2. Spacecraft Housekeeping command occur 1h before thruster enable.
· SetScState housekeeping 
3. Verify Thruster enable command occurs within STF maneuver window.
4. Verify no eclipse occurs from cat bed heater on through set SC mode 
Mission.
5. Verify cat bed heaters come on 55 min before burn
...
 
was 7a:
Inertial Maneuver Commands : Perigee
1.     Verify cat bed heaters come on 55 min before burn
...
is 8:
Maneuver Commands : Perigee
1. Verify no eclipse occurs from cat bed heater on through set SC mode 
Mission.
2. Verify cat bed heaters come on 55 min before burn
...
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Chelle Reno
Austin Mission Consulting
(210) 478-7337 (c)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~

From: isocops-bounces at lists.sr.unh.edu on behalf of Ibex Mission 
Operations
Sent: Thu 1/12/2012 5:04 PM
To: Bret Hautamaki; IBEX-FDG; IBEXOPS/ORB; ISOC at New Hampshire; John 
Cavallo; Tapley, Mark; Robert Lockwood; Roland Vanderspek; Ryan Tyler; 
Sheral Wesley; Thomas Regiec; Tim Perry; Walker Cross
Subject: [Isocops] IBEX Orbit# 154 v001 ATS (25 Jan - 4 Feb 12)

Guys,
    Here are the planning files and ATS for Orbit# 154.
Please respond to this thread for your approvals/comments.
All approvals/comments are required by 1900 UTC on 14 Jan 12.
Orbit# 152 Perigee activities start on 16 Jan 12 @ 1045 UTC

-- 
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
(304) 279-6678[attachment "IBEX-Command-Approval-Checklist-Rev8.doc" 
deleted by Tim Perry/ORBVA] 



-----------------------------------------
Notice:  This e-mail is intended solely for use of the individual
or entity to which it is addressed and may contain information that
is proprietary, privileged and exempt from disclosure under
applicable law.  If the reader is not the intended recipient or
agent responsible for delivering the message to the intended
recipient, you are hereby notified that any dissemination,
distribution or copying of this communication is strictly
prohibited.  This communication may also contain data subject to
U.S. export laws.  If so, that data subject to the International
Traffic in Arms Regulation cannot be disseminated, distributed or
copied to foreign nationals, residing in the U.S. or abroad, absent
the express prior approval of the U.S. Department of State.   If
you have received this communication in error, please notify the
sender by reply e-mail and destroy the e-mail message and any
physical copies made of the communication.  Thank you.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20120123/79b2ecec/attachment-0001.html 


More information about the Isocops mailing list