RCC must test a recently updated Emergency Power Off (EPO) panel for
the Lenharth Data Center (LDC).  We will utilize temporary power to
maintain the Morse Hall building network connections to the outside
world for the duration of this test.

All systems contained within the data center will be
powered down on 12/20/16 between 7am and 9am for this test.  This
includes all Mail, Web and HPC systems.  The UNH Campus Mail Exchange
server will not be affected.  

The Premise HPC systems will be shut down the evening of 12/19/16.  If you
would like your hardware shut down the evening of the 19th or have
other questions please ask your normal RCC contact or email
rccops at sr.unh.edu.

Follow UNHRCC on Twitter  https://urldefense.proofpoint.com/v2/url?u=https-3A__twitter.com_unhrcc&d=DgIFAg&c=c6MrceVCY5m5A_KAUkrdoA&r=IfEl9FNxcQ76BsmbrYqfdafMRuppQ5OICBce6-xAhM0&m=KjVEJA8aWmfngrVMWAWStGpU-N6Tac4MyKbkc42xbAE&s=JK0i5C2WoTaah-RMuTKEA8GzALd4P7eObLBCpKRdsWY&e=  for updated
information as it occurs.

Thanks,
Mark

--Mark Maciolek
Network Administrator
Morse Hall Rm 338
http://www.unh.edu/research/support-units/research-computing-center




More information about the Trillian-users mailing list