Attached are the planning files for Orbit #671. Please respond to this thread with comments and approvals. Approvals for the Orbit 671 ATS are required by COB, 30 November 2024.
1.
Battery Balancing
Eclipse
Flag True: 2024/12/19 18:00:00
Eclipse
Flag False: 2024/12/19 19:30:00
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2024_345_o0671a_v001.ccvr
# Input files: 1
# IBEX_2024_345_o0671a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
### The first 2 constraint violations are because of the contact “IBEX,USAK01,ADD,12/19/24,354,23:00:00,12/20/24,355,00:30:00,LAHO 160K IBEX-3 Orbit# 671 SSR_Dump/Tracking Contact/10 Asc” was scheduled for 90 minutes. This is not a problem.
IBX-CLC-006: Planned transmission at 2024/12/19 22:58:00 UTC - 2024/12/20
00:32:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-015: Battery charge falls below minimum from 2024/12/20 00:17:00 UTC -
2024/12/20 00:32:00 UTC. Lowest charge level is 7498.840000
watt-minutes during this interval.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/12/11 00:35:58 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/12/14 05:06:31 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
IBEX MOC (703)404-7470
Cell (301) 606-1430