All, 

   Attached are the planning files for Orbit #671. Please respond to this thread with comments and approvals. Approvals for the Orbit 671 ATS are required by COB, 30 November 2024.

 

 

Please note the following: 

 

1.        Battery Balancing

Eclipse Flag True: 2024/12/19 18:00:00

Eclipse Flag False: 2024/12/19 19:30:00

 

2.        Command Load Constraint Violation Report (CCVR) 

IBEX_2024_345_o0671a_v001.ccvr

# Input files:         1

#   IBEX_2024_345_o0671a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

### The first 2 constraint violations are because of the contact “IBEX,USAK01,ADD,12/19/24,354,23:00:00,12/20/24,355,00:30:00,LAHO 160K IBEX-3 Orbit# 671 SSR_Dump/Tracking Contact/10 Asc” was scheduled for 90 minutes. This is not a problem.

 

IBX-CLC-006: Planned transmission at 2024/12/19 22:58:00 UTC - 2024/12/20

             00:32:00 UTC exceeds the maximum contiguous transmission time of

             5400 seconds

IBX-CLC-015: Battery charge falls below minimum from 2024/12/20 00:17:00 UTC -

             2024/12/20 00:32:00 UTC. Lowest charge level is 7498.840000

             watt-minutes during this interval.

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/12/11 00:35:58 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/12/14 05:06:31 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

IBEX MOC (703)404-7470

Cell (301) 606-1430