November 3, 2024 at 18:18Good evening team,
The second perigee pass failed. SSC was having issues with the station and the station power was extremely low (between 11 and 34 watts throughout the pass). I switched to 2k and was able to get telemetry and make sure that the spacecraft itself was OK. I was also able to send a no-op. We’ll need to schedule an extra support sometime this week to redump the missing blocks.
Best,
Andrea Coca Gonzales | Associate Engineer Satellite Systems | MEV | ICESat-2 | TESS | IBEX
Northrop Grumman Corporation | Dulles Chapter Adelante Member Engagement Lead | Space Systems
From: Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>
Sent: Sunday, November 3, 2024 10:56 AM
To: Coca Gonzales, Andrea [US] (SP) <Andrea.CocaGonzales@ngc.com>; bhautama@gmail.com; carol.weaver@unh.edu; Cavallo, John A [US] (SP) <John.Cavallo@ngc.com>; Chubin, Eric [US] (SP) <Eric.Chubin@ngc.com>; Fleming, Ed [US] (SP) <Ed.Fleming@ngc.com>; ADS-IBEX@l3harris.com; ibexops@gmail.com; IBEXOPS@gmail.com; isocops@lists.sr.unh.edu; kwfairchild@gmail.com; Ken.Fairchild@unh.edu; Leonard, Ben [US] (SP) <Benjamin.Leonard@ngc.com>; angoldconsulting@earthlink.net; nangold@princeton.edu; Perry, Timothy E [US] (SP) <Timothy.Perry@ngc.com>; Reed, Cheryl L [US] (SP) <Cheryl.Reed@ngc.com>; Tyler, Ryan S [US] (SP) <Ryan.Tyler@ngc.com>; Wynn, Reese [US] (SP) <Reese.Wynn@ngc.com>; ezirnstein@swri.edu; Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>
Subject: IBEX Goat Herder for 3 Nov 2024
All,
The 1st perigee contact was intermittent for telemetry. The Orbit# 668 ATS was uploaded successfully, and the SSR_Dump will be re-dumped on the 2nd perigee contact
The following objectives were accomplished
- Reset Master timer
- SSR_Dump (new)
- CAR# 1423 Upload Orbit# 668 ATS
IEBX_2024_318_o0688a_v001 (149-246)
Results from the inertial maneuver
Q1 0.56903700
Q2 -0.54756100
Q3 -0.10315900
Q4 0.60475700
GPS sec 1414675757
UTC time 11/03/2024 13:29:03
MPS Diff 0.738 deg
MPS Cmd Vector X -0.77535600
MPS Cmd Vector Y -0.57580900
MPS Cmd Vector Z -0.25935800
CSS Angle TLM 0.300296
CSS Sun-Pointing Angle 0.591491
30 Oct 24 @20:00:00
CSS Angle TLM 0.692386
CSS Sun-Pointing Angle 1.384772
03 Nov 24 @13:30:00
Pre-Burn
Thruster 1 8160 30 Oct 24 @20:00:00
Thruster 2 7952
Thruster 3 9696
Thruster 4 9904
Post-Burn
Thruster 1 8464 03 Nov 24 @13:30:00
Thruster 2 8256
Thruster 3 10000
Thruster 4 10208
Number of Pulses
Thruster 1 304
Thruster 2 304
Thruster 3 304
Thruster 4 304
Thruster Pairs
Thruster 1 & 2 608
Thruster 3 & 4 608