All,
The 1st perigee contact was intermittent for telemetry. The Orbit# 668 ATS was uploaded successfully, and the SSR_Dump will be re-dumped on the 2nd perigee contact
The following objectives were accomplished
IEBX_2024_318_o0688a_v001 (149-246)
Results from the inertial maneuver
Q1 0.56903700
Q2 -0.54756100
Q3 -0.10315900
Q4 0.60475700
GPS sec 1414675757
UTC time 11/03/2024 13:29:03
MPS Diff 0.738 deg
MPS Cmd Vector X -0.77535600
MPS Cmd Vector Y -0.57580900
MPS Cmd Vector Z -0.25935800
CSS Angle TLM 0.300296
CSS Sun-Pointing Angle 0.591491
30 Oct 24 @20:00:00
CSS Angle TLM 0.692386
CSS Sun-Pointing Angle 1.384772
03 Nov 24 @13:30:00
Pre-Burn
Thruster 1 8160 30 Oct 24 @20:00:00
Thruster 2 7952
Thruster 3 9696
Thruster 4 9904
Post-Burn
Thruster 1 8464 03 Nov 24 @13:30:00
Thruster 2 8256
Thruster 3 10000
Thruster 4 10208
Number of Pulses
Thruster 1 304
Thruster 2 304
Thruster 3 304
Thruster 4 304
Thruster Pairs
Thruster 1 & 2 608
Thruster 3 & 4 608
Best Regards,
Sheral Wesley |
Sr
Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com