All,

  The spacecraft is nominal. The inertial maneuver was successful. The SSR was dumped, and it had zero errors.

 

Tasks Accomplished:

SSR Dump -> Dump New

Reset 18 Day Timer

Reset FDC totals

 

Results from the Inertial Maneuver:

Q1 -0.62010200 ActNor.EstInrToBdy[0]

Q2 0.06508870 ActNor.EstInrToBdy[1]

Q3 0.70720400 ActNor.EstInrToBdy[2]

Q4 0.33331700 ActNor.EstInrToBdy[3]

 

GPS sec 1408276864 ActNor.EstTime

UTC time 08/21/2024 12:00:50 output

 

MPS Cmd Vector X -0.83292400

MPS Cmd Vector Y 0.51123700

MPS Cmd Vector Z 0.21183700

 

CSS Angle TLM 0.724157

CSS Sun-Pointing Angle 1.448314

  18 Aug 24 @02:00:00

 

CSS Angle TLM 0.723887

CSS Sun-Pointing Angle 1.447774

  21 Aug 24 @12:00:00

 

Pre-Burn   

Thruster 1 4096 18 Aug 24 @02:00:00

Thruster 2 4032

Thruster 3 4272

Thruster 4 4336

Post-Burn  

Thruster 1 4368 21 Aug 24 @12:00:00

Thruster 2 4304

Thruster 3 4608

Thruster 4 4672

Number of Pulses 

Thruster 1 272

Thruster 2 272

Thruster 3 336

Thruster 4 336

Thruster Pairs 

Thruster 1 & 2 544

Thruster 3 & 4 672

 

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

IBEX MOC (703)404-7470

Cell (301) 606-1430