Nigel,
The outage timing in the forecast OEF and per-orbit OEF are very different. The maneuver time is more consistent
The apogee maneuver window opens at 2024-08-16T18:18:15 but the maneuver doesn't start until 2024-08-17T07:46:10 even there's no star tracker outage. Why is that?
Thanks,
Nigel
August 1, 2024 at 14:29All,
The planning file for Orbit# 658 are attached. Please respond to this email thread with your comments and approvals. Approvals for Orbit# 658 are required by COB 2 Aug 24.
Please note the following:
- Command Load Constraint Violation Report (CCVR)
IBEX_2024_225_o0658a_v001.ccvr
# Input files: 1
# IBEX_2024_225_o0658a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2024/08/21 11:58:00 UTC - 2024/08/21
13:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2024/08/21 16:58:00 UTC - 2024/08/21
18:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
- (2) scheduled perigee contacts
- IBEX,USHI01,ADD,08/21/24,234,12:00:00,08/21/24,234,13:00:00,LAHO 320K IBEX-2 Orbit# 658 SSR_Dump/Tracking Contact 11re Desc
- IBEX,USAK01,ADD,08/21/24,234,17:00:00,08/21/24,234,18:00:00,LAHO 2K IBEX-2 Orbit# 658 Tracking Contact Perigee
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/13 02:34:02 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/17 09:01:40 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Best Regards,
Sheral Wesley | Sr Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 | sheral.wesley@ngc.com
July 22, 2024 at 13:55Attached are the planning files for Orbit #657. Please respond to this thread with comments and approvals. Approvals for the Orbit 657 ATS are required by COB, 24 July 2024.
1. Battery Balancing
Eclipse Flag True: 2024/08/12 16:00:00
Eclipse Flag False: 2024/08/12 17:30:00
2. Command Load Constraint Violation Report (CCVR)
IBEX_2024_216_o0657a_v001.ccvr
# Input files: 1
# IBEX_2024_216_o0657a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/04 03:12:53 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/07 19:42:28 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES..
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
IBEX MOC (703)404-7470
Cell (301) 606-1430
Please restrict discussions on this email list to non-ITAR sensitive topics.