All,

The planning file for Orbit# 658 are attached.  Please respond to this email thread with your comments and approvals. Approvals for Orbit# 658 are required by COB 2 Aug 24.

 

Please note the following:

 

  1. Command Load Constraint Violation Report (CCVR)

              IBEX_2024_225_o0658a_v001.ccvr

              #   Input files:         1

              #   IBEX_2024_225_o0658a_v001.scr

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2024/08/21 11:58:00 UTC - 2024/08/21

             13:02:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-006: Planned transmission at 2024/08/21 16:58:00 UTC - 2024/08/21

             18:02:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

 

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/08/13 02:34:02 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/08/17 09:01:40 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

Best Regards,

 

Sheral Wesley  |  Sr Principal Engineer, Satellite Systems

Northrop Grumman Corporation  |  Space Systems

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com