All,
The planning file for Orbit# 658 are attached. Please respond to this email thread with your comments and approvals. Approvals for Orbit# 658 are required by COB 2 Aug 24.
Please note the following:
IBEX_2024_225_o0658a_v001.ccvr
# Input files: 1
# IBEX_2024_225_o0658a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2024/08/21 11:58:00 UTC - 2024/08/21
13:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2024/08/21 16:58:00 UTC - 2024/08/21
18:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/13 02:34:02 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/08/17 09:01:40 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Best Regards,
Sheral Wesley |
Sr
Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com