Attached are the planning files for Orbit #653. Please respond to this thread with comments and approvals. Approvals for the Orbit 653 ATS are required by COB, 18 June 2024.
1.
Battery Balancing
Eclipse
Flag True: 2024/07/07 17:00:00
Eclipse
Flag False: 2024/07/07 18:30:00
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2024_180_o0653a_v001.ccvr
# Input files: 1
# IBEX_2024_180_o0653a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2024/07/07 13:58:00 UTC - 2024/07/07
15:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5460.000 seconds)
IBX-CLC-006: Planned transmission at 2024/07/07 19:35:00 UTC - 2024/07/07
20:39:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5460.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/06/29 02:36:33 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/07/02 19:55:22 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.