Good morning team,
The perigee contacts were nominal, and the inertial maneuver was successful. We performed the following, dump SSR (VCid2), dump missing SSR blocks (CAR#1394)
and reset master timer. Both contacts were done on maestro IBEX-1. We were unable to make socket connections with string 2.
Tasks Accomplished:
Reset Master Timer
Reset FDC Totals
SSR Dump New (VCid2)
SSR Dump Nblocks (CAR#1394)
CAR #1393 Orbit 150 ATS upload
IBEX_2024_153_o0650a_v001 - 103 commands
Results from the inertial maneuver:
Q1 -0.33764800
Q2 0.46035800
Q3 0.30865900
Q4 0.76078500
GPS sec 1400591460
UTC time
05/24/2024 13:10:46
MPS Diff
0.654
MPS Cmd Vector X
0.48949900
MPS Cmd Vector Y
0.80359800
MPS Cmd Vector Z
0.33855700
CSS Angle TLM 0.0625573
CSS Sun-Pointing Angle 0.1251146
19 May 24 @22:00:00
CSS Angle TLM 0.0667314
CSS Sun-Pointing Angle 0.1334628
24 May 24 @22:00:00
Pre-Burn
Thruster 1 24992 19 May 24 @22:00:00
Thruster 2 24272
Thruster 3 32736
Thruster 4 33456
Post-Burn
Thruster 1 25264 24 May 24 @13:00:00
Thruster 2 24544
Thruster 3 33040
Thruster 4 33760
Number of Pulses
Thruster 1 272
Thruster 2 272
Thruster 3 304
Thruster 4 304
Thruster Pairs
Thruster 1 & 2 544
Thruster 3 & 4 608
Best,
Andrea Coca Gonzales | Associate
Engineer Satellite Systems | MEV | ICESat-2 | TESS | IBEX
Northrop Grumman Corporation | Space Systems
C: 703-582-8233 |
Andrea.CocaGonzales@ngc.com