Attached are the planning files for Orbit #650. Please respond to this thread with comments and approvals. Approvals for the Orbit 650 ATS are required by 1700 , 23 May 2024.
1. Battery Balancing
Eclipse Flag True: 2024/06/10 21:00:00
Eclipse Flag False: 2024/06/10 22:30:00
2. Command Load Constraint Violation Report (CCVR)
IBEX_2024_153_o0650a_v001.ccvr
# Input files: 1
# IBEX_2024_153_o0650a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATION
==========================
I saw this violation IBX-CLC-015. I looked for any small eclipses or close transmitter times. We never drop to zero. I can’t explain why this is flagging other than maybe an MPS miscalculation.
IBX-CLC-015: Battery charge falls below minimum from 2024/06/02 04:43:00 UTC -
2024/06/02 14:04:00 UTC. Lowest charge level is 3736.960000
watt-minutes during this interval.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/06/02 07:01:28 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/06/06 00:17:58 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
IBEX MOC (703)404-7470
Cell (301) 606-1430