All, 

   Attached are the planning files for Orbit #650. Please respond to this thread with comments and approvals. Approvals for the Orbit 650 ATS are required by 1700 , 23 May 2024.

 

 

Please note the following: 

 

1.        Battery Balancing

Eclipse Flag True: 2024/06/10 21:00:00

Eclipse Flag False: 2024/06/10 22:30:00

 

2.        Command Load Constraint Violation Report (CCVR) 

IBEX_2024_153_o0650a_v001.ccvr

# Input files:         1

#   IBEX_2024_153_o0650a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

        SOFT CONSTRAINT VIOLATION

==========================

 

I saw this violation IBX-CLC-015. I looked for any small eclipses or close transmitter times. We never drop to zero. I can’t explain why this is flagging other than maybe an MPS miscalculation.

 

IBX-CLC-015: Battery charge falls below minimum from 2024/06/02 04:43:00 UTC -

             2024/06/02 14:04:00 UTC. Lowest charge level is 3736.960000

             watt-minutes during this interval.

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/06/02 07:01:28 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/06/06 00:17:58 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations