All, 

   Attached are the planning files for Orbit #646. Please respond to this thread with comments and approvals. Approvals for the Orbit 646 ATS are required by COB, 16 April 2024.

 

 

Please note the following: 

 

1.        No Battery Balancing

 

2.        Moderate Eclipse – No action is required

 2024-04-29T14:11:44.833Z,PenumbraEntry,orbit:646

2024-04-29T16:09:47.072Z,PenumbraExit,orbit:646

 

3.        Command Load Constraint Violation Report (CCVR) 

IBEX_2024_117_o0646a_v001.ccvr

# Input files:         1

#   IBEX_2024_117_o0646a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

This violation is due to  the moderate eclipse 2024-04-29T14:11:44 - 2024-04-29T16:09:47

 

IBX-CLC-015: Battery charge falls below minimum from 2024/04/29 15:01:44 UTC -

             2024/04/29 19:52:47 UTC. Lowest charge level is 2737.014667

             watt-minutes during this interval.

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/04/27 08:55:55 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/05/01 01:14:06 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

IBEX MOC (703)404-7470

Cell (301) 606-1430