Attached are the planning files for Orbit #645. Please respond to this thread with comments and approvals. Approvals for the Orbit 645 ATS are required by COB, 07 April 2024.
Approvals
for the Pre-Eclipse ATS are required by COB 16 April 2024.
Please
note the following:
1.
Battery Balancing
Since
we are setting the eclipse Flag for the upcoming eclipse rehearsal, I didn’t see the need to add balancing commands at perigee.
Eclipse
Flag True: 2024/04/17 20:00:00
Eclipse
Flag False: 2024/04/17 21:30:00
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2024_108_o0645a_v001.ccvr
# Input files: 1
# IBEX_2024_108_o0645a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
The IBX-CLC-006 violations are expected since we have the long duration contacts planned on the 19th and 20th.
The IBX-CLC-015 Violation is flagging due to the long transmitter times. Why it starts so early and ends on the 22nd I’m not sure. I think the long transmitter durations are throwing off the power
model. I checked the MPS timeline, and it does show valid power after 2024/04/22 05:48:11. But, from past experience we should be power positive for the duration.
IBX-CLC-006: Planned transmission at 2024/04/19 11:58:00 UTC - 2024/04/19
14:58:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2024/04/19 14:58:00 UTC - 2024/04/19
15:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 11040.000 seconds)
IBX-CLC-006: Planned transmission at 2024/04/20 05:28:00 UTC - 2024/04/20
15:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-015: Battery charge falls below minimum from 2024/04/17 13:48:39 UTC -
2024/04/22 05:48:11 UTC. Lowest charge level is 0.000000
watt-minutes during this interval.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/04/18 07:08:06 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/04/22 01:40:59 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
IBEX MOC (703)404-7470
Cell (301) 606-1430