All,

   The spacecraft is nominal. The inertial maneuver was successful.

 

Results from the Inertial Maneuver:

Q1 -0.29876700 ActNor.EstInrToBdy[0]

Q2 0.64758800 ActNor.EstInrToBdy[1]

Q3 -0.32093500 ActNor.EstInrToBdy[2]

Q4 0.62319200 ActNor.EstInrToBdy[3]

     

GPS sec 1394629516 ActNor.EstTime

UTC time 03/16/2024 13:05:02 output

 

MPS Diff 0.648 deg

 

MPS Cmd Vector X 0.99906300

MPS Cmd Vector Y -0.035202000

MPS Cmd Vector Z -0.025182000

 

CSS Angle TLM 1.34988

CSS Sun-Pointing Angle 2.69976

  12 Mar 24 @11:00:00

 

CSS Angle TLM 0.974179

CSS Sun-Pointing Angle 1.948358

  16 Mar 24 @13:00:00

 

Pre-Burn   

Thruster 1 21056 12 Mar 24 @11:00:00

Thruster 2 20400

Thruster 3 28448

Thruster 4 29104

 

Post-Burn  

Thruster 1 21344 16 Mar 24 @13:00:00

Thruster 2 20688

Thruster 3 28752

Thruster 4 29408

Number of Pulses  

Thruster 1 288

Thruster 2 288

Thruster 3 304

Thruster 4 304

Thruster Pairs 

Thruster 1 & 2 576

Thruster 3 & 4 608

 

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

IBEX MOC (703)404-7470

Cell (301) 606-1430