Nigel,

Yeah, I was surprised when I saw it in the new forecast OEF.  I asked FDG about it and it was predicted.  It appeared in last year's MC analysis.  It is unusual that we didn't see it until this month though.  It is pretty short and that may be the reason why.  I didn't ping Ryan about it.

Ken

On Tue, Feb 20, 2024 at 1:13 PM NIgel Angold <nangold@princeton.edu> wrote:
Hmm, I wasn't expecting a penumbral eclipse until 29 April 2024. It's very short but does FDG see this too?

Nigel
February 20, 2024 at 09:56

All,

   Attached are the planning files for Orbit #639. Please respond to this thread with comments and approvals. Approvals are required by COB 21 Feb 2024.

 

Please note the following:

 

1.                   No Battery Balancing

 

2.                   SHORT Eclipse ASC. Apogee/ No eclipse commands needed

 

3.                   Command Load Constraint Violation Report (CCVR)

IBEX_2024_063_o0640a_v001.ccvr

# Input files:         1

#   IBEX_2024_063_o0640a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/03/03 11:05:15 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/03/07 06:05:18 UTC

==============

OTHER MESSAGES

 

SHORT Eclipse ASC. Apogee/ No eclipse commands needed

 

2024-03-07T01:32:28.336Z,PenumbraEntry,orbit:640

2024-03-07T01:32:28.336Z,EclipseEntry,moderate:false,long:false,orbit:640

2024-03-07T01:45:14.277Z,PenumbraExit,orbit:640

2024-03-07T01:45:14.277Z,EclipseExit,moderate:false,long:false,orbit:640

==============

NO MESSAGES.

 

 

Best Regards,

 

Sheral Wesley  |  Sr Principal Engineer, Satellite Systems

Northrop Grumman Corporation  |  Space Systems

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com

 

February 8, 2024 at 10:25

All, 

   Attached are the planning files for Orbit #639. Please respond to this thread with comments and approvals. Approvals are required by COB 12 February 2024.

 

Please note the following: 

 

1.        No Battery Balancing

Eclipse Flag True: 2024/03/03 01:00:00

Eclipse Flag False: 2024/03/03 02:30:00

 

2.        Command Load Constraint Violation Report (CCVR) 

IBEX_2024_053_o0639a_v001.ccvr

# Input files:         1

#   IBEX_2024_053_o0639a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/02/23 06:39:01 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/02/27 13:17:14 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

IBEX MOC (703)404-7470

Cell (301) 606-1430

 




Please restrict discussions on this email list to non-ITAR sensitive topics.