All,
Attached are the planning files for Orbit #639. Please respond to this thread with comments and approvals. Approvals are required by
COB 21 Feb 2024.
Please note the following:
1.
No Battery Balancing
2.
SHORT Eclipse ASC. Apogee/ No eclipse commands needed
3.
Command Load Constraint Violation Report (CCVR)
IBEX_2024_063_o0640a_v001.ccvr
# Input files: 1
# IBEX_2024_063_o0640a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/03/03 11:05:15 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2024/03/07 06:05:18 UTC
==============
OTHER MESSAGES
SHORT Eclipse ASC. Apogee/ No eclipse commands needed
2024-03-07T01:32:28.336Z,PenumbraEntry,orbit:640
2024-03-07T01:32:28.336Z,EclipseEntry,moderate:false,long:false,orbit:640
2024-03-07T01:45:14.277Z,PenumbraExit,orbit:640
2024-03-07T01:45:14.277Z,EclipseExit,moderate:false,long:false,orbit:640
==============
NO MESSAGES.
Best Regards,
Sheral Wesley |
Sr
Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com