All, 

   Attached are the planning files for Orbit #638. Please respond to this thread with comments and approvals. Approvals are required by COB 03 February 2024.

 

Please note the following: 

 

1.        Battery Balancing

Eclipse Flag True: 2024/02/22 18:00:00

Eclipse Flag False: 2024/02/22 19:30:00

 

2.        Command Load Constraint Violation Report (CCVR) 

IBEX_2024_044_o0638a_v001.ccvr

# Input files:         1

#   IBEX_2024_044_o0638a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2024/02/22 20:58:00 UTC - 2024/02/22

             22:02:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 5880.000 seconds)

IBX-CLC-006: Planned transmission at 2024/02/23 02:28:00 UTC - 2024/02/23

             03:32:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 5880.000 seconds)

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/02/13 22:32:00 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2024/02/17 20:34:00 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations