   The spacecraft is nominal. The sun maneuver was successful. I was able to set the static Z rate during the contact. The star tracker percent valid was@58. I was unable to switch connections from maestro3 to maestro1 for testing. When the NMC tried they saw that the connection to maestro1 would not connect properly. I will talk to SSC on Monday about this issue.

 

Tasks Accomplished:

Reset FDC Totals

Set Static Z rate     

 

Results from the Sun Maneuver:

CSS Angle TLM 1.14261

CSS Sun-Pointing Angle 2.28522

  11 Dec 23 @04:00:00

CSS Angle TLM 1.07265

CSS Sun-Pointing Angle 2.1453

  15 Dec 23 @21:00:00

Pre-Burn   

Thruster 1 16144 11 Dec 23 @04:00:00

Thruster 2 15680

Thruster 3 21296

Thruster 4 21760

Post-Burn  

Thruster 1 16288 15 Dec 23 @21:00:00

Thruster 2 15776

Thruster 3 21696

Thruster 4 22208

Number of Pulses  

Thruster 1 144

Thruster 2 96

Thruster 3 400

Thruster 4 448

Thruster Pairs  

Thruster 1 & 2 240

Thruster 3 & 4 848

 

 