All,
The spacecraft is nominal. The sun maneuver was successful. I was able to set the static Z rate during the contact. The star tracker percent valid was@58.
I was unable to switch connections from maestro3 to maestro1 for testing. When the NMC tried they saw that the connection to maestro1 would not connect properly. I will talk to SSC on Monday about this issue.
Tasks Accomplished:
Reset FDC Totals
Set Static Z rate
Results from the Sun Maneuver:
CSS Angle TLM 1.14261
CSS Sun-Pointing Angle 2.28522
11 Dec 23 @04:00:00
CSS Angle TLM 1.07265
CSS Sun-Pointing Angle 2.1453
15 Dec 23 @21:00:00
Pre-Burn
Thruster 1 16144 11 Dec 23 @04:00:00
Thruster 2 15680
Thruster 3 21296
Thruster 4 21760
Post-Burn
Thruster 1 16288 15 Dec 23 @21:00:00
Thruster 2 15776
Thruster 3 21696
Thruster 4 22208
Number of Pulses
Thruster 1 144
Thruster 2 96
Thruster 3 400
Thruster 4 448
Thruster Pairs
Thruster 1 & 2 240
Thruster 3 & 4 848
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
Cell (301) 606-1430