All,
The spacecraft is nominal. The sun maneuver was successful. The star tracker percent valid was at 0%, so we were not able to set the static z rate. The
Orbit 630 ATS was uplinked.
Tasks Accomplished:
CAR #1356 Orbit #630 ATS upload
IBEX_2023_336_o0630a_v001 98 cmds
Results for the Sun Maneuver:
CSS Angle TLM 0.722534
CSS Sun-Pointing Angle 1.445068
23 Nov 23 @06:00:00
CSS Angle TLM 0.871555
CSS Sun-Pointing Angle 1.74311
27 Nov 23 @21:00:00
Pre-Burn
Thruster 1 14928 23 Nov 23 @06:00:00
Thruster 2 14512
Thruster 3 19632
Thruster 4 20048
Post-Burn
Thruster 1 15328 27 Nov 23 @21:00:00
Thruster 2 14864
Thruster 3 20160
Thruster 4 20624
Number of Pulses
Thruster 1 400
Thruster 2 352
Thruster 3 528
Thruster 4 576
Thruster Pairs
Thruster 1 & 2 752
Thruster 3 & 4 1104
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
Cell (301) 606-1430