I approve IBEX_2023_326_o0629a_v001.scr

Nigel
Wesley, Sheral R [US] (SP)
November 9, 2023 at 15:09

All, 

   Attached are the planning files for Orbit #629. Please respond to this thread with comments and approvals. Approvals are required by COB 12 Nov 2023 

 

Please note the following: 

 

1.        Perigee Battery Balancing

The eclipse flag has been set for battery balancing

Orbit 629 Eclipse Flag Second Eclipse

# 2023-12-02T05:16:40.130Z,Perigee,orbit:629

  @ECT_SetLongEclipseFlag TRUE $TIME=2023/12:02:06:00:00

  @ECT_SetLongEclipseFlag FALSE $TIME=2023/12:02:07:30:00 

 

2.        Apogee Sun Maneuver

 

3.        Command Load Constraint Violation Report (CCVR) 

IBEX_2023_326_o0629a_v001.ccvr

 

# Input files:         1

#   IBEX_2023_326_o0629a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/11/23 09:50:42 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/11/27 15:49:31 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

Best Regards,

 

Sheral Wesley  |  Sr Principal Engineer, Satellite Systems

Northrop Grumman Corporation  |  Space Systems

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com




Please restrict discussions on this email list to non-ITAR sensitive topics.
______________________________________________
Isocops mailing list
Isocops@lists.sr.unh.edu
https://lists.sr.unh.edu/mailman/listinfo/isocops
Wesley, Sheral R [US] (SP)
November 2, 2023 at 16:09

All, 

   Attached are the planning files for Orbit #628. Please respond to this thread with comments and approvals. Approvals are required by COB 3 Nov 2023 

 

Please note the following: 

Command Load Constraint Violation Report (CCVR) 

# Input files:         1

#   IBEX_2023_317_o0628a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/11/14 09:42:42 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/11/18 12:45:24 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

Best Regards,

 

Sheral Wesley  |  Sr Principal Engineer, Satellite Systems

Northrop Grumman Corporation  |  Space Systems

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com

 




Please restrict discussions on this email list to non-ITAR sensitive topics.
______________________________________________
Isocops mailing list
Isocops@lists.sr.unh.edu
https://lists.sr.unh.edu/mailman/listinfo/isocops
Perry, Timothy E [US] (SP)
October 13, 2023 at 10:32

All, 

   Attached are the planning files for Orbit #626. Please respond to this thread with comments and approvals. Approvals are required by COB 16 Oct 2023 

 

Please note the following: 

1.        The ATS I will hold off on up-linking it until later into orbit# 625, just in case we decide to change the maneuvers to sun maneuvers.

 

2.        Perigee Eclipse

# 2023-11-04T20:48:55.421Z,EclipseEntry,moderate:true,long:false,orbit:626

# 2023-11-04T21:48:25.246Z,EclipseExit,moderate:true,long:false,orbit:626 . 

Eclipse Flag -> True 2023/11:04:19:00:00

Eclipse Flag -> False 2023/11:04:22:05:00

 

3.        Command Load Constraint Violation Report (CCVR) 

IBEX_2023_290_o0626a_v001.ccvr

# Input files:         1

#   IBEX_2023_299_o0626a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-015: Battery charge falls below minimum from 2023/11/04 21:54:00 UTC -

             2023/11/05 08:02:00 UTC. Lowest charge level is 2006.577785

             watt-minutes during this interval.

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/10/27 06:18:06 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2023/10/31 08:21:18 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

Cell (301) 606-1430

 




Please restrict discussions on this email list to non-ITAR sensitive topics.
______________________________________________
Isocops mailing list
Isocops@lists.sr.unh.edu
https://lists.sr.unh.edu/mailman/listinfo/isocops