All,

   The spacecraft is nominal, and the inertial maneuver was successful.

 

Results from the Inertial Maneuver:

Q1 -0.47685200 ActNor.EstInrToBdy[0]

Q2 -0.42647900 ActNor.EstInrToBdy[1]

Q3 0.30211800 ActNor.EstInrToBdy[2]

Q4 0.70671900 ActNor.EstInrToBdy[3]

     

GPS sec 1377327668 ActNor.EstTime

UTC time 08/29/2023 07:00:54 output

 

MPS Diff 0.706 deg

 

MPS Cmd Vector X -0.89360900

MPS Cmd Vector Y 0.415653000

MPS Cmd Vector Z 0.169401000

 

CSS Angle TLM 0.0906541

CSS Sun-Pointing Angle 0.1813082

  24 Aug 23@22:00:00

 

CSS Angle TLM 0.32145

CSS Sun-Pointing Angle 0.6429

  29 Aug 23@03:00:00

 

Pre-Burn   

Thruster 1 10432 24 Aug 23@22:00:00

Thruster 2 10192

Thruster 3 12640

Thruster 4 12880

Post-Burn  

Thruster 1 10704 29 Aug 23@03:00:00

Thruster 2 10464

Thruster 3 12912

Thruster 4 13152

Number of Pulses  

Thruster 1 272

Thruster 2 272

Thruster 3 272

Thruster 4 272

Thruster Pairs 

Thruster 1 & 2 544

Thruster 3 & 4 544

 

 

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

Cell (301) 606-1430