All,

   The spacecraft is nominal and the inertial maneuver was successful.

 

 

Results of the Inertial Maneuver:

Q1 -0.57933300 ActNor.EstInrToBdy[0]

Q2 0.15680900 ActNor.EstInrToBdy[1]

Q3 0.71511300 ActNor.EstInrToBdy[2]

Q4 0.35832700 ActNor.EstInrToBdy[3]

     

GPS sec 1375772440 ActNor.EstTime

UTC time 08/11/2023 07:00:26 output

 

MPS Diff 0.748 deg

 

MPS Cmd Vector X -0.719652000

MPS Cmd Vector Y 0.640917000

MPS Cmd Vector Z 0.267070000

 

CSS Angle TLM 0.231547

CSS Sun-Pointing Angle 0.463094

  06 Aug 23@19:00:00

 

CSS Angle TLM 0.335135

CSS Sun-Pointing Angle 0.67027

  11 Aug 23@07:00:00

 

Pre-Burn   

Thruster 1 9392 06 Aug 23@19:00:00

Thruster 2 9152

Thruster 3 11427

Thruster 4 11712

Post-Burn  

Thruster 1 9632 11 Aug 23@07:00:00

Thruster 2 9392

Thruster 3 11760

Thruster 4 12000

Number of Pulses  

Thruster 1 240

Thruster 2 240

Thruster 3 333

Thruster 4 288

Thruster Pairs 

Thruster 1 & 2 480

Thruster 3 & 4 621

 

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

Cell (301) 606-1430