All,
The apogee contact for Orbit# 601 was nominal for command/telemetry and the inertial maneuver was successful. The Orbit 602 ATS was also uploaded and the
FC back orbit data dumped.
Tasks Accomplished:
CAR# 1300 Upload Orbit# 602 ATS
IBEX_2023_081_o0602a_v001
Dump Back orbit data
Results from the Inertia Maneuver:
Q1: -0.12692800 ActNor.EstInrToBdy[0]
Q2: 0.70113600 ActNor.EstInrToBdy[1]
Q3: -0.15343800 ActNor.EstInrToBdy[2]
Q4: 0.68465600 ActNor.EstInrToBdy[3]
GPS sec: 1363102624 ActNor.EstTime
UTC time: 03/17/2023 15:36:50 output
MPS Diff: 0.681 deg
MPS Cmd Vector X: 0.999114000
MPS Cmd Vector Y: -0.034034000
MPS Cmd Vector Z: -0.024746000
CSS Angle TLM 1.28314
CSS Sun-Pointing Angle 2.56628
13 Mar 23@07:00:00
CSS Angle TLM 0.936282
CSS Sun-Pointing Angle 1.872564
17 Mar 23@15:00:00
Pre-Burn
Thruster 1 1392 13 Mar 23@07:00:00
Thruster 2 1312
Thruster 3 1520
Thruster 4 1600
Post-Burn
Thruster 1 1664 17 Mar 23@15:00:00
Thruster 2 1584
Thruster 3 1840
Thruster 4 1920
Number of Pulses
Thruster 1 272
Thruster 2 272
Thruster 3 320
Thruster 4 320
Thruster Pairs
Thruster 1 & 2 544
Thruster 3 & 4 640
Best Regards,
Sheral Wesley |
Sr
Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com