All,
The perigee contacts were nominal. The inertial maneuver was successful. The orbit 601 ATS was uplinked. The SSR was downlinked and the star tracker image dump was completed.
Tasks Accomplished:
Procedure S924-OP31212 Star Tracker Image Dump
CAR #1299 orbit 601 ATS uplink
IBEX_2023_072_o0601a_v001
Reset Master Timer
Reset FDC Totals
Results from the Inertial Maneuver:
Q1 -0.55634600 ActNor.EstInrToBdy[0]
Q2 0.46482400 ActNor.EstInrToBdy[1]
Q3 -0.57599600 ActNor.EstInrToBdy[2]
Q4 0.37768700 ActNor.EstInrToBdy[3]
GPS sec 1362727854 ActNor.EstTime
UTC time
03/13/2023 07:30:40 output
MPS Diff
0.604 deg
MPS Cmd Vector X 0.992667000
MPS Cmd Vector Y -0.106524000
MPS Cmd Vector Z -0.057146000
CSS Angle TLM 1.13453
CSS Sun-Pointing Angle 2.26906
08 Mar
23@15:00:00
CSS Angle TLM 1.28314
CSS Sun-Pointing Angle 2.56628
13 Mar
23@07:00:00
Pre-Burn
Thruster 1 1040 08 Mar 23@15:00:00
Thruster 2 1040
Thruster 3 1232
Thruster 4 1232
Post-Burn
Thruster 1 1392 13 Mar 23@07:00:00
Thruster 2 1312
Thruster 3 1520
Thruster 4 1600
Number of Pulses
Thruster 1 352
Thruster 2 272
Thruster 3 288
Thruster 4 368
Thruster Pairs
Thruster 1 & 2 624
Thruster 3 & 4 656