All,

   The spacecraft is nominal and the inertial maneuver was successful. The orbit 600 ATS and the orbit 601 Hi Gain CAL ATS was uplinked. We had an issue with the first USHI01 contact. We were never able to get a good uplink from the station. After trying for ~30 minutes we ended the contact and scheduled a USAK01 contact from 08:00 – 09:00 GMT. This contact was successful and we saw a good receiver AGC throughout the contact. I also noticed that the Flight computer back orbit buffer was not filling up. I resent the command to enable to Flight computer buffer to start collecting tlm. The FC buffer is incrementing now.

 

Tasks Accomplished:

CAR # 1297 Orbit 599 Return to science after master Computer Reset

Step # 14 Upload Orbit 600 ATS

  IBEX_2023_063_o0600a_v001 103 commands

CAR 1298 Orbit 601 Hi gain Cal ATS uplink

   IBEX_2023_072_o0601a_v001_hgc

SSR Dump -> Dump New

Enable FC Back orbit tlm

 

Results from the Inertial Maneuver:

Q1 -0.33849500 ActNor.EstInrToBdy[0]

Q2 0.66359400 ActNor.EstInrToBdy[1]

Q3 -0.44493600 ActNor.EstInrToBdy[2]

Q4 0.49708700 ActNor.EstInrToBdy[3]

     

GPS sec 1361948173 ActNor.EstTime

UTC time 03/04/2023 06:55:59 output

 

MPS Diff 0.633 deg

 

MPS Cmd Vector X 0.962011000

MPS Cmd Vector Y -0.246322000

MPS Cmd Vector Z -0.117728000

 

CSS Angle TLM 0.727393

CSS Sun-Pointing Angle 1.454786

  03 Mar 23@03:30:00

 

CSS Angle TLM 0.990316

CSS Sun-Pointing Angle 1.980632

  04 Mar 23@06:30:00

 

Pre-Burn   

Thruster 1 592 03 Mar 23@03:30:00

Thruster 2 592

Thruster 3 768

Thruster 4 768

Post-Burn  

Thruster 1 752 04 Mar 23@06:30:00

Thruster 2 752

Thruster 3 928

Thruster 4 928

Number of Pulses  

Thruster 1 160

Thruster 2 160

Thruster 3 160

Thruster 4 160

Thruster Pairs  

Thruster 1 & 2 320

Thruster 3 & 4 320