All, 

   Attached are the planning files for Orbit #600. Please respond to this thread with comments and approvals.   

Approvals are required by COB, 22 Feb 2023 

  

Please note the following: 

1.       Battery Balancing this orbit 

Begin 2023/03/13 03:00:00– End 2023/03/13 04:30:00 

 

2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2023_063_o0600a_v001.ccvr 

# Input files:         1 

#   IBEX_2023_063_o0600a_v001.scr 

 

========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 

 

========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-006: Planned transmission at 2023/03/13 06:58:00 UTC - 2023/03/13 

             08:32:00 UTC exceeds the maximum contiguous transmission time of 

             5400 seconds 

IBX-CLC-006: Planned transmission at 2023/03/13 10:28:00 UTC - 2023/03/13 

             11:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 9480.000 seconds) 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2023/03/04 13:50:47 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2023/03/08 08:00:13 UTC 

 

============== 

OTHER MESSAGES 

============== 

NO MESSAGES.