All,
The spacecraft is nominal and the inertial maneuver was successful. The Orbit 592 ATS was uplinked. The SSR was dumped and the master timer was reset.
The Test USAK01 contacts were not successful. SSC is still investigating why we cannot achieve frame sync. We tried on the first 2 contacts with no success. SSC reported seeing a valid downlink, no interference, but they were unable to achieve frame
sync. We canceled the 3rd contact. We will try again once SSC has had a chance to look at the data.
Tasks Achieved:
CAR # 1282 Orbit # 592 ATS uplink
IBEX_2022_356_o0592a_v001 111 cmds
CAR # 1283 Orbit 590 Alaska test contacts
IBEX_2022_347_o0590a_Add_Contacts_v001 10 cmds
Reset Master Timer
Reset FDC Totals
SSR Dump -> Dump New
Results from the Inertial Maneuver
Q1 0.69390300 ActNor.EstInrToBdy[0]
Q2 0.46335600 ActNor.EstInrToBdy[1]
Q3 -0.36843800 ActNor.EstInrToBdy[2]
Q4 0.40994400 ActNor.EstInrToBdy[3]
GPS sec 1354970013 ActNor.EstTime
UTC time 12/13/2022 12:33:19 output
MPS Diff
0.719 deg
MPS Cmd Vector X -0.128122000
MPS Cmd Vector Y -0.905895000
MPS Cmd Vector Z -0.403657000
CSS Angle TLM 0.797313
CSS Sun-Pointing Angle 1.594626
09 Dec
22@18:30:00
CSS Angle TLM 1.84896
CSS Sun-Pointing Angle 3.69792
13 Dec
22@12:30:00
Pre-Burn
Thruster 1 1536 09 Dec 22@18:30:00
Thruster 2 1488
Thruster 3 2336
Thruster 4 2384
Post-Burn
Thruster 1 1904 13 Dec 22@12:30:00
Thruster 2 1856
Thruster 3 2720
Thruster 4 2768
Number of Pulses
Thruster 1 368
Thruster 2 368
Thruster 3 384
Thruster 4 384
Thruster Pairs
Thruster 1 & 2 736
Thruster 3 & 4 768