All, 

   Attached are the planning files for Orbit #592. Please respond to this thread with comments and approvals. Approvals are required by COB, 12 Dec 2022 

  

Please note the following: 

1.       No Battery Balancing this orbit 

 

2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2022_356_o0592a_v001.ccvr 

# Input files:         1 

#   IBEX_2022_356_o0592a_v001.scr 

 

========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 

 

========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

The 2 IBX-CLC-006 soft violations are acceptable. There is a 4.5 hour separation between the 2 contacts.  

  

IBX-CLC-006: Planned transmission at 2022/12/31 03:58:00 UTC - 2022/12/31 

             05:02:00 UTC is followed by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 5880.000 seconds) 

IBX-CLC-006: Planned transmission at 2022/12/31 09:28:00 UTC - 2022/12/31 

             10:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 5880.000 seconds) 

 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/12/23 05:06:59 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/12/26 13:38:54 UTC 

 

============== 

OTHER MESSAGES 

============== 

NO MESSAGES.