Subject: IBEX Orbit #592 ATS Approval (23 Dec 2022 – 01 Jan 2023)
All,
Attached are the planning files for Orbit #592. Please respond to this thread with comments and approvals. Approvals are required by COB, 12 Dec 2022
Please note the following:
1.
No Battery Balancing this orbit
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2022_356_o0592a_v001.ccvr
# Input files:
1
#
IBEX_2022_356_o0592a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
The 2 IBX-CLC-006 soft violations are acceptable. There is a 4.5 hour separation between the 2 contacts.
IBX-CLC-006: Planned transmission at 2022/12/31 03:58:00 UTC - 2022/12/31
05:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5880.000 seconds)
IBX-CLC-006: Planned transmission at 2022/12/31 09:28:00 UTC - 2022/12/31
10:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5880.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/12/23 05:06:59 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/12/26 13:38:54 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.