All,
The first perigee contact for Orbit# 585 was nominal and the inertial maneuver was successful.
The SSR_Dump contact with USAK01 was a failure. At AOS, we did not see downlink and tried to command to a lower downlink data rate with no success.
We then tried to blind acq the spacecraft @160k with no success and tried again to command the downlink to 2k & to 40k with no success.
The contact was ended early and a scheduled Blind_Acq contact with HAW01 @1045z was successful to monitor the health of the spacecraft.
Tasks Accomplished:
CAR # 1275 Orbit 587 ATS UploadIBEX_2022_311_o0587a_v001 93 cmds
Dump Backorbit data
Reset FDC totals
Reset 18 Day Timer
Blind_acq.scr
Q1 -0.56096800
ActNor.EstInrToBdy[0]
Q2 -0.53963000
ActNor.EstInrToBdy[1]
Q3 0.61039700
ActNor.EstInrToBdy[2]
Q4 0.14673100
ActNor.EstInrToBdy[3]
GPS sec
1351020724 ActNor.EstTime
UTC time
10/28/2022 19:31:50
output
MPS Diff 0.699
deg
MPS Cmd Vector X
-0.840662000
MPS Cmd Vector Y
-0.493233000
MPS Cmd Vector Z
-0.223624000
CSS Angle TLM 0.358274
CSS Sun-Pointing Angle
0.716548
27 Oct 22 @02:30:00
CSS Angle TLM 0.218503
CSS Sun-Pointing Angle
0.437006
28 Oct 22 @18:32:00
Pre-Burn
Thruster 1
7936 27 Oct 22 @02:30:00
Thruster 2
7696
Thruster 3
10096
Thruster 4
10336
Post-Burn
Thruster 1
8064 28 Oct 22 @18:32:00
Thruster 2
7824
Thruster 3
10224
Thruster 4
10464
Number of Pulses
Thruster 1
128
Thruster 2
128
Thruster 3
128
Thruster 4
128
Thruster Pairs
Thruster 1 & 2 256
Thruster 3 & 4 256
Sheral Wesley |
Sr Principal Engineer, Satellite
Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com