I approve IBEX_2022_292_o0585a_v001.scr

Nigel
Wesley, Sheral R [US] (SP)
October 6, 2022 at 16:21
All,
Please review the following for approval.
Approvals are due by COB  9 Oct  22

  1. Apogee Sun Maneuver 
2022-10-24T10:35:07.000Z,SunMvrBegin,(mvrDuration):900,orbit:585
2022-10-24T10:50:07.000Z,SunMvrEnd,orbit:585


Sheral Wesley  |  Sr Principal Engineer, Satellite Systems  

Northrop Grumman Corporation  |  Space Systems 

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com 

 

 

Wesley, Sheral R [US] (SP)
September 27, 2022 at 13:51
All,
Please review the following for approval.
Approvals are due by COB 29 Sept 22

  1. Apogee Sun Maneuver 
2022-10-15T02:17:14.000Z,SunMvrBegin
2022-10-15T02:32:14.000Z,SunMvrEnd,orbit:584


  1. Command Load Constraint Violation Report (CCVR)
# Input files:         1
#   IBEX_2022_283_o0584a_v001.scr

==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.

==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2022/10/10 14:23:39 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2022/10/15 03:32:20 UTC

==============
OTHER MESSAGES
==============
NO MESSAGES.



Sheral Wesley  |  Sr Principal Engineer, Satellite Systems  

Northrop Grumman Corporation  |  Space Systems 

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com