Hi all,

I have looked at the orbit 0584 ATS file, IBEX_2022_283_o0584a_v001.scr and I approve.

 

The constraint violations in IBEX_2022_283_o0584a_v001.ccvr are from the removal of the ACT_SetSpinPulseProtectEnable Enable commands. The violations are acceptable.

 

The PL commands in IBEX_2022_283_o0584a_v001.scr match those in the STF, IBEX_2022_283_o0584a_v002.stf.

 

Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF, IBEX_2022_283_o0584a_v001.oef and as verified with ibex_orbit.

 

There is 1 star tracker outage this orbit. It is the ~8 day outage that started in 0583 and ends ~51 hours before the apogee maneuver.

  

The ground station command sequences are correct and the timing and bit rates match those in the contacts file, IBEX_Orbit584_Contacts.txt for all contacts (3).

 

Battery Balancing is 90 minutes long, more than 2 hours away from payload descending macros, and more than 15 minutes away from a maneuver.

 

The Sun maneuver at perigee of orbit 0583 left us pointing in safe directions for the orbit 0584 arc A ascending and descending sequences:

 

ibex_rotate -o -r +195.253 -d -6.500 -w ibex-sun -t 2022/10:10:17:37:02

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.958572,-0.261391,-0.113203

which is     R.A. +195.253 Decl.  -6.500

missing      R.A. +195.776 Decl.  -6.740 (ibex-sun)

error is     R.A.   +0.523 Decl.  +0.240

for a total  0.572 deg

 

ibex_rotate -o -r +195.253 -d -6.500 -w ibex-sun -t 2022/10:15:00:44:06

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.958572,-0.261391,-0.113203

which is     R.A. +195.253 Decl.  -6.500

missing      R.A. +199.646 Decl.  -8.280 (ibex-sun)

error is     R.A.   +4.393 Decl.  +1.780

for a total  4.707 deg

 

 

The Sun precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:

 

ibex_rotate -o -r +199.716 -d  -8.307 -w ibex-sun -t 2022/10:15:02:32:14

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.931500,-0.333819,-0.144477

which is     R.A. +199.716 Decl.  -8.307

missing      R.A. +199.716 Decl.  -8.307 (ibex-sun)

error is     R.A.   +0.000 Decl.  +0.000

for a total  0.000 deg

 

ibex_rotate -o -r +199.716 -d  -8.307 -w ibex-sun -t 2022/10:15:04:02:20

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.931500,-0.333819,-0.144477

which is     R.A. +199.716 Decl.  -8.307

missing      R.A. +199.773 Decl.  -8.329 (ibex-sun)

error is     R.A.   +0.057 Decl.  +0.022

for a total  0.061 deg

 

ibex_rotate -o -r +199.716 -d  -8.307 -w ibex-sun -t 2022/10:19:10:11:22

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.931500,-0.333819,-0.144477

which is     R.A. +199.716 Decl.  -8.307

missing      R.A. +203.826 Decl.  -9.919 (ibex-sun)

error is     R.A.   +4.110 Decl.  +1.612

for a total  4.367 deg

 

The Inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 0585 apogee:

 

ibex_rotate -o -u -0.916321,-0.363741,-0.167474 -w ibex-sun -t 2022/10:19:13:59:40

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.916321,-0.363741,-0.167474

which is     R.A. +201.651 Decl.  -9.641

missing      R.A. +203.983 Decl.  -9.986 (ibex-sun)

error is     R.A.   +2.332 Decl.  +0.345

for a total  2.323 deg

 

ibex_rotate -o -u -0.916321,-0.363741,-0.167474 -w ibex-sun -t 2022-10-24T10:37:03

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.916321,-0.363741,-0.167474

which is     R.A. +201.651 Decl.  -9.641

missing      R.A. +208.508 Decl. -11.677 (ibex-sun)

error is     R.A.   +6.857 Decl.  +2.036

for a total  7.039 deg

 

There is no overlap with orbit 0583 commands.

 

Command Approval Checklist is attached.

  

Carol

 

-- 

Carol Weaver

University of New Hampshire

503.902.8492

 

From: Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>
Date: Tuesday, 2022-September-27 at 17:23
To: Perry, Timothy E [US] (SP) <Timothy.Perry@ngc.com>, angoldconsulting <angoldconsulting@earthlink.net>, Carol Weaver <carol.weaver@unh.edu>, Chubin, Eric [US] (SP) <Eric.Chubin@ngc.com>, David Heirtzler <David.Heirtzler@unh.edu>, Kenneth Fairchild <Ken.Fairchild@unh.edu>, IBEXOPS (IBEXOPS@gmail.com) <ibexops@gmail.com>, ADS-IBEX <ads-ibex@l3harris.com>, ISOC <isocops@lists.sr.unh.edu>, Ken Fairchild <kwfairchild@gmail.com>, Paul Janzen <Paul.Janzen@mso.umt.edu>, Tyler, Ryan S [US] (SP) <Ryan.Tyler@ngc.com>, Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>, Wynn, Reese [US] (SP) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit# 584 ATS Approval (10 Oct - 19 Oct 22)

CAUTION: This email originated from outside of the University System. Do not click links or open attachments unless you recognize the sender and know the content is safe.

 

All,

Please review the following for approval.

Approvals are due by COB 29 Sept 22

 

  1. Apogee Sun Maneuver 

2022-10-15T02:17:14.000Z,SunMvrBegin
2022-10-15T02:32:14.000Z,SunMvrEnd,orbit:584

 

 

  1. Command Load Constraint Violation Report (CCVR)

# Input files:         1

#   IBEX_2022_283_o0584a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2022/10/10 14:23:39 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2022/10/15 03:32:20 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

Sheral Wesley  |  Sr Principal Engineer, Satellite Systems  

Northrop Grumman Corporation  |  Space Systems 

O: 703-406-5641  |  C: 202-236-0802  |  sheral.wesley@ngc.com