All, 

    The perigee contacts were nominal and the sun maneuver was successful. The Lo was commanded back to normal mode. We dumped the SSR for orbit 580. The ATS for orbit 582 was up-linked.  

 

Tasks Accomplished: 

CAR # 1236 IEX Hi Background and Lo Magnetotail season  

   Completed Pass #3 Lo back to Normal mode 

CAR # 1266 Orbit # 582 ATS uplink  

    IBEX_2022_264_o0582a_v001 98 Cmds 

Set Static Z rate – from 4.172 -> 4.187 

Reset the 18 day timer  

SSR Dump -> Dump New 

   

 

Results from the Sun Maneuver: 

CSS Angle TLM 1.04042  

CSS Sun-Pointing Angle 2.08084  

  08 Sept 22 @01:00:00 

CSS Angle TLM 1.22189  

CSS Sun-Pointing Angle 2.44378  

  12 Sept 22 @10:00:00 

Pre-Burn    

Thruster 1 5616 08 Sept 22 @01:00:00 

Thruster 2 5488  

Thruster 3 6480  

Thruster 4 6608  

Post-Burn    

Thruster 1 5776 12 Sept 22 @10:00:00 

Thruster 2 5648  

Thruster 3 6896  

Thruster 4 7024  

Number of Pulses    

Thruster 1 160  

Thruster 2 160  

Thruster 3 416  

Thruster 4 416  

Thruster Pairs   

Thruster 1 & 2 320  

Thruster 3 & 4 832