On 09/08/2022 2:09 PM Perry, Timothy E [US] (SP) <timothy.perry@ngc.com> wrote:
All,
Attached are the planning files for Orbit #582. Please respond to this thread with comments and approvals.
Approvals are required by COB, 11 Sept 2022
Please note the following:
1. Battery Balancing this orbit
Begin 2022/10/01 03:00:00– End 2022/10/01 04:30:00
2. Command Load Constraint Violation Report (CCVR)
IBEX_2022_264_o0582a_v001.ccvr
# Input files: 1
# IBEX_2022_264_o0582a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2022/09/30 16:58:00 UTC - 2022/09/30
18:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2022/09/30 19:28:00 UTC - 2022/09/30
20:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/09/22 01:22:19 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/09/26 04:30:50 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.