All,

I have looked at the orbit 582 ATS,

IBEX_2022_264_o0582a_v001.scr,
 
and I approve.
 
The only constraint violations in
 
IBEX_2022_264_o0582a_v001.ccvr
 
are from the removal of the

ACT_SetSpinPulseProtectEnable Enable

commands (2) and the proximity of two contacts; the violations are expected.
 
Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF,
 
IBEX_2022_264_o0582a_v001.oef,
 
and as verified with ibex_orbit.
 
There are no star tracker outages.
 
The ground station command sequences are correct and the timing and bit rates match those in the contacts file,
 
IBEX_Orbit582_Contacts.txt,
 
for all contacts (4).
 
We are doing battery cell balancing and the balancing commands are correct and offset by enough time from other commands.
 
The inertial precession maneuver at perigee of orbit 581 leaves us pointing in safe directions for the orbit 582 arc A ascending and descending sequences:
 
ibex_rotate -o -u -0.997725,0.06487,0.018325 -w ibex-sun -t 2022/09:22:05:40:16
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.997725,+0.064870,+0.018325
 which is R.A. +176.280 Decl. +1.050
 missing R.A. +179.016 Decl. +0.410 (ibex-sun)
 error is R.A. +2.736 Decl. +0.640
 for a total 2.810 deg
 
ibex_rotate -o -u -0.997725,0.06487,0.018325 -w ibex-sun -t 2022/09:26:01:42:36
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.997725,+0.064870,+0.018325
 which is R.A. +176.280 Decl. +1.050
 missing R.A. +182.354 Decl. -1.014 (ibex-sun)
 error is R.A. +6.074 Decl. +2.064
 for a total 6.414 deg
 
The inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:
 
ibex_rotate -o -u -0.999868,-0.007818,-0.014276 -w ibex-sun -t 2022/09:26:03:25:44
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.999868,-0.007818,-0.014276
 which is R.A. +180.448 Decl. -0.818
 missing R.A. +182.418 Decl. -1.040 (ibex-sun)
 error is R.A. +1.970 Decl. +0.222
 for a total 1.982 deg

ibex_rotate -o -u -0.999868,-0.007818,-0.014276 -w ibex-sun -t 2022/09:26:05:00:50
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.999868,-0.007818,-0.014276
 which is R.A. +180.448 Decl. -0.818
 missing R.A. +182.477 Decl. -1.065 (ibex-sun)
 error is R.A. +2.029 Decl. +0.247
 for a total 2.044 deg

ibex_rotate -o -u -0.999868,-0.007818,-0.014276 -w ibex-sun -t 2022/09:30:19:05:19
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.999868,-0.007818,-0.014276
 which is R.A. +180.448 Decl. -0.818
 missing R.A. +186.716 Decl. -2.890 (ibex-sun)
 error is R.A. +6.268 Decl. +2.072
 for a total 6.598 deg

The inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 583 apogee:

ibex_rotate -o -u -0.99583,-0.07972,-0.044352 -w ibex-sun -t 2022/09:30:23:16:33
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.995830,-0.079720,-0.044352
 which is R.A. +184.577 Decl. -2.542
 missing R.A. +186.880 Decl. -2.968 (ibex-sun)
 error is R.A. +2.303 Decl. +0.426
 for a total 2.339 deg

ibex_rotate -o -u -0.99583,-0.07972,-0.044352 -w ibex-sun -t 2022-10-05T18:33:05.296Z
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI -0.995830,-0.079720,-0.044352
 which is R.A. +184.577 Decl. -2.542
 missing R.A. +191.134 Decl. -4.773 (ibex-sun)
 error is R.A. +6.557 Decl. +2.231
 for a total 6.913 deg

Lo Normal mode for the entire orbit.

There is no overlap with orbit 581 commands by manual inspection or by checking at


Command Approval Checklist is attached.

Ken
                                                
On 09/08/2022 2:09 PM Perry, Timothy E [US] (SP) <timothy.perry@ngc.com> wrote:


All, 

   Attached are the planning files for Orbit #582. Please respond to this thread with comments and approvals.   

Approvals are required by COB, 11 Sept 2022 

  

Please note the following: 

1.       Battery Balancing this orbit 

Begin 2022/10/01 03:00:00– End 2022/10/01 04:30:00 


2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2022_264_o0582a_v001.ccvr 

# Input files:        

#   IBEX_2022_264_o0582a_v001.scr 


========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 


========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-006: Planned transmission at 2022/09/30 16:58:00 UTC - 2022/09/30 

             18:02:00 UTC is followed by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-006: Planned transmission at 2022/09/30 19:28:00 UTC - 2022/09/30 

             20:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/22 01:22:19 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/26 04:30:50 UTC 


============== 

OTHER MESSAGES 

============== 

NO MESSAGES.