All, 

   Attached are the planning files for Orbit #582. Please respond to this thread with comments and approvals.   

Approvals are required by COB, 11 Sept 2022 

  

Please note the following: 

1.       Battery Balancing this orbit 

Begin 2022/10/01 03:00:00– End 2022/10/01 04:30:00 

 

2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2022_264_o0582a_v001.ccvr 

# Input files:         1 

#   IBEX_2022_264_o0582a_v001.scr 

 

========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 

 

========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-006: Planned transmission at 2022/09/30 16:58:00 UTC - 2022/09/30 

             18:02:00 UTC is followed by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-006: Planned transmission at 2022/09/30 19:28:00 UTC - 2022/09/30 

             20:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/22 01:22:19 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/26 04:30:50 UTC 

 

============== 

OTHER MESSAGES 

============== 

NO MESSAGES.