Hi all,

I have looked at the orbit 0581 ATS file, IBEX_2022_255_o0581a_v001.scr and I approve.

 

The constraint violations in IBEX_2022_255_o0581a_v001.ccvr are from the removal of the ACT_SetSpinPulseProtectEnable Enable commands and contacts being close together on 2022-09-21. The violations are acceptable.

 

The PL commands in IBEX_2022_255_o0581a_v001.scr match those in the STF, IBEX_2022_255_o0581a_v002.stf.

 

Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF, IBEX_2022_255_o0581a_v001.oef and as verified with ibex_orbit.

 

There are no star tracker outages this orbit.

  

The ground station command sequences are correct and the timing and bit rates match those in the contacts file, IBEX_Orbit581_Contacts.txt for all contacts (4).

 

Battery Balancing is 90 minutes long, more than 2 hours away from payload descending macros, and more than 15 minutes away from a maneuver.

 

The Sun maneuver at perigee of orbit 0580 left us pointing in safe directions for the orbit 0581 arc A ascending and descending sequences:

 

ibex_rotate -o -r +170.204 -d +4.219 -w ibex-sun -t 2022/09:12:19:25:43

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.982749,+0.169680,+0.073569

which is     R.A. +170.204 Decl.  +4.219

missing      R.A. +170.562 Decl.  +4.049 (ibex-sun)

error is     R.A.   +0.358 Decl.  +0.170

for a total  0.395 deg

 

ibex_rotate -o -r +170.204 -d +4.219 -w ibex-sun -t 2022/09:16:17:33:47

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.982749,+0.169680,+0.073569

which is     R.A. +170.204 Decl.  +4.219

missing      R.A. +173.965 Decl.  +2.616 (ibex-sun)

error is     R.A.   +3.761 Decl.  +1.603

for a total  4.082 deg

 

 

The Inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:

 

ibex_rotate -o -u -0.989232,0.137936,0.048919 -w ibex-sun -t 2022/09:16:19:16:55

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.989232,+0.137936,+0.048919

which is     R.A. +172.062 Decl.  +2.804

missing      R.A. +174.029 Decl.  +2.590 (ibex-sun)

error is     R.A.   +1.967 Decl.  +0.214

for a total  1.976 deg

 

ibex_rotate -o -u -0.989232,0.137936,0.048919 -w ibex-sun -t 2022/09:16:20:52:01

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.989232,+0.137936,+0.048919

which is     R.A. +172.062 Decl.  +2.804

missing      R.A. +174.088 Decl.  +2.565 (ibex-sun)

error is     R.A.   +2.026 Decl.  +0.239

for a total  2.037 deg

 

ibex_rotate -o -u -0.989232,0.137936,0.048919 -w ibex-sun -t 2022/09:21:14:14:13

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.989232,+0.137936,+0.048919

which is     R.A. +172.062 Decl.  +2.804

missing      R.A. +178.440 Decl.  +0.687 (ibex-sun)

error is     R.A.   +6.378 Decl.  +2.117

for a total  6.717 deg

 

The Inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 0582 apogee:

 

ibex_rotate -o -u -0.997725,0.06487,0.018325 -w ibex-sun -t 2022/09:21:19:19:01

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.997725,+0.064870,+0.018325

which is     R.A. +176.280 Decl.  +1.050

missing      R.A. +178.634 Decl.  +0.593 (ibex-sun)

error is     R.A.   +2.354 Decl.  +0.457

for a total  2.398 deg

 

ibex_rotate -o -u -0.997725,0.06487,0.018325 -w ibex-sun -t 2022-09-26T13:11:05

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

points axis  +1.000000,+0.000000,+0.000000

towards ECI  -0.997725,+0.064870,+0.018325

which is     R.A. +176.280 Decl.  +1.050

missing      R.A. +182.782 Decl.  -1.192 (ibex-sun)

error is     R.A.   +6.502 Decl.  +2.242

for a total  6.878 deg

 

There is no overlap with orbit 0580 commands.

 

Command Approval Checklist is attached.

  

Carol

-- 

Carol Weaver

University of New Hampshire

503.902.8492

 

From: Perry, Timothy E [US] (SP) <Timothy.Perry@ngc.com>
Date: Wednesday, 2022-August-31 at 10:59
To: Carol Weaver <carol.weaver@unh.edu>, David Heirtzler <David.Heirtzler@unh.edu>, IBEX FDG Group <ADS-IBEX@l3harris.com>, IBEXOPS <IBEXOPS@gmail.com>, Kenneth Fairchild <Ken.Fairchild@unh.edu>, angoldconsulting <angoldconsulting@earthlink.net>, Paul Janzen <Paul.Janzen@mso.umt.edu>, Chubin, Eric [US] (SP) <Eric.Chubin@ngc.com>, ISOC <isocops@lists.sr.unh.edu>, Ken Fairchild <fair-play@comcast.net>, Ken Fairchild (kwfairchild@gmail.com) <kwfairchild@gmail.com>, Perry, Timothy E [US] (SP) <Timothy.Perry@ngc.com>, Tyler, Ryan S [US] (SP) <Ryan.Tyler@ngc.com>, Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>, Wynn, Reese [US] (SP) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit #581 ATS Approval (12 - 21 Sept 2022)

CAUTION: This email originated from outside of the University System. Do not click links or open attachments unless you recognize the sender and know the content is safe.

 

All, 

   Attached are the planning files for Orbit #581. Please respond to this thread with comments and approvals.   

Approvals are required by 2000, 2 Sept 2022 

  

Please note the following: 

1.       Battery Balancing this orbit 

Begin 2022/09/21 21:00:00– End 2022/09/21 22:30:00 

 

2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2022_255_o0581a_v001.ccvr 

#   IBEX_2022_255_o0581a_v001.scr 

 

========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 

 

========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-006: Planned transmission at 2022/09/21 11:58:00 UTC - 2022/09/21 

             13:02:00 UTC is followed by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-006: Planned transmission at 2022/09/21 14:28:00 UTC - 2022/09/21 

             15:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/12 14:55:05 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/16 20:22:01 UTC 

 

============== 

OTHER MESSAGES 

============== 

NO MESSAGES.