I approve IBEX_2022_255_o0581a_v001.scr

Nigel
Perry, Timothy E [US] (SP)
August 31, 2022 at 07:47

All, 

   Attached are the planning files for Orbit #581. Please respond to this thread with comments and approvals.   

Approvals are required by 2000, 2 Sept 2022 

  

Please note the following: 

1.       Battery Balancing this orbit 

Begin 2022/09/21 21:00:00– End 2022/09/21 22:30:00 

 

2.       Command Load Constraint Violation Report (CCVR) 

IBEX_2022_255_o0581a_v001.ccvr 

#   IBEX_2022_255_o0581a_v001.scr 

 

========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 

 

========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-006: Planned transmission at 2022/09/21 11:58:00 UTC - 2022/09/21 

             13:02:00 UTC is followed by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-006: Planned transmission at 2022/09/21 14:28:00 UTC - 2022/09/21 

             15:32:00 UTC is preceded by one or more additional transmissions 

             which, when combined, exceed the maximum transmission time of 5400 

             seconds within a 18000-second window (total planned transmission 

             time this window is 7680.000 seconds) 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/12 14:55:05 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/09/16 20:22:01 UTC 

 

============== 

OTHER MESSAGES 

============== 

NO MESSAGES. 

 





Please restrict discussions on this email list to non-ITAR sensitive topics.
______________________________________________
Isocops mailing list
Isocops@lists.sr.unh.edu
https://lists.sr.unh.edu/mailman/listinfo/isocops