All,
Attached are the planning files for Orbit #581. Please respond to this thread with comments and approvals.
Approvals are required by 2000, 2 Sept 2022
Please note the following:
1.
Battery Balancing this orbit
Begin 2022/09/21 21:00:00– End 2022/09/21 22:30:00
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2022_255_o0581a_v001.ccvr
# IBEX_2022_255_o0581a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2022/09/21 11:58:00 UTC - 2022/09/21
13:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2022/09/21 14:28:00 UTC - 2022/09/21
15:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/09/12 14:55:05 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/09/16 20:22:01 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.