All,
The perigee contacts were nominal. The Sun Maneuver was successful. During the second contact I was able to set the static Z rate. The ssr dump had 5 missing blocks, but we were able to redump the missing blocks. The ATS for Orbit 572 was uplinked during
the first pass.
Tasks Accomplished:
CAR #1248 Orbit #572 ATS uplink
IBEX_2022_173_o0572a_v001 98 Cmds
CAR #1249 Dump Orbit #570 Missing Blocks
SSR Dump -> Dump New
Reset 18 Day Timer
Set Static Z rate
Reset FDC Totals
Results from the Sun Maneuver:
CSS Angle TLM 0.08846
CSS Sun-Pointing Angle 0.17692
09 June 22 @12:00:00
CSS Angle TLM 1.60279
CSS Sun-Pointing Angle 3.20558
13 June 22 @17:00:00
Pre-Burn
Thruster 1 256 09 June 22 @12:00:00
Thruster 2 256
Thruster 3 304
Thruster 4 304
Post-Burn
Thruster 1 528 13 June 22 @17:00:00
Thruster 2 528
Thruster 3 848
Thruster 4 848
Number of Pulses
Thruster 1 272
Thruster 2 272
Thruster 3 544
Thruster 4 544
Thruster Pairs
Thruster 1 & 2 544
Thruster 3 & 4 1088