All,
The perigee contacts were nominal. The inertial maneuver was successful.
The MOC had issues with the comm/data lines between SSC and Dulles. Data was offline at the MOC from 2102z-2120z and the issue is currently under investigation by
Doug Hughes.
Tasks Accomplished:
SSR Dump -> Dump New
Reset 18 Day Timer
CAR # 1246 Orbit # 571 ATS Upload
IBEX _2022_164_o0571a_v001 (91 Cmds, 556-646)
CAR# 1245 Re-Dump ORbit# 568 missing Blocks
SSR_Dump (NBlks, start 125580, NUMBlks 10)
Results from the Inertial Maneuver:
Q1 -0.55426300 ActNor.EstInrToBdy[0]
Q2 0.07404390 ActNor.EstInrToBdy[1]
Q3 -0.17930600 ActNor.EstInrToBdy[2]
Q4 0.80941900 ActNor.EstInrToBdy[3]
GPS sec 1338415318 ActNor.EstTime
UTC time 06/04/2022 22:01:44
MPS Diff 0.500 deg
MPS Cmd Vector X 0.313077000
MPS Cmd Vector Y 0.874920000
MPS Cmd Vector Z 0.369455000
CSS Angle TLM 0.148038
CSS Sun-Pointing Angle 0.296076
31 May 22 @ 13:00:00
CSS Angle TLM 0.4841
CSS Sun-Pointing Angle 0.9682
04 June 22 @21:00:00
Pre-Burn
Thruster 1 2896 31 May 22 @ 13:00:00
Thruster 2 2864
Thruster 3 3248
Thruster 4 3280
Post-Burn
Thruster 1 3200 04 June 22 @21:00:00
Thruster 2 3136
Thruster 3 3536
Thruster 4 3600
Number of Pulses
Thruster 1 304
Thruster 2 272
Thruster 3 288
Thruster 4 320
Thruster Pairs
Thruster 1 & 2 576
Thruster 3 & 4 608
Sheral Wesley |
Sr Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com