All,

I have looked at the orbit 567 ATS,

IBEX_2022_129_o0567a_v001.scr,

and I approve.

The only constraint violations in

IBEX_2022_129_o0567a_v001.ccvr

are from the removal of the

ACT_SetSpinPulseProtectEnable Enable

commands (2); the violations are expected.

Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF,

IBEX_2022_129_o0567a_v001.oef,

and as verified with ibex_orbit.

There is one star tracker outage.  The outage starts ~1 day before 15 Re descending and runs for about 1.5 days.  Some despinning may be required due to this outage.

The ground station command sequences are correct and the timing and bit rates match those in the contacts file,

IBEX_Orbit567_Contacts.txt,

for all contacts (3).

We are doing battery cell balancing and the balancing commands are correct and offset by enough time from other commands.

The inertial precession maneuver at perigee of orbit 566 leaves us pointing in safe directions for the orbit 567 arc A ascending and descending sequences:

ibex_rotate -o -u 0.694466,0.663692,0.277902 -w ibex-sun -t 2022/05:09:15:19:48
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.694466,+0.663692,+0.277902
 which is R.A. +43.702 Decl. +16.135
 missing R.A. +46.202 Decl. +17.353 (ibex-sun)
 error is R.A. +2.500 Decl. +1.218
 for a total 2.686 deg

ibex_rotate -o -u 0.694466,0.663692,0.277902 -w ibex-sun -t 2022/05:13:04:19:23
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.694466,+0.663692,+0.277902
 which is R.A. +43.702 Decl. +16.135
 missing R.A. +49.725 Decl. +18.305 (ibex-sun)
 error is R.A. +6.023 Decl. +2.170
 for a total 6.148 deg

The inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:

ibex_rotate -o -u 0.639493,0.709283,0.296592 -w ibex-sun -t 2022/05:13:06:02:31
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.639493,+0.709283,+0.296592
 which is R.A. +47.962 Decl. +17.253
 missing R.A. +49.796 Decl. +18.324 (ibex-sun)
 error is R.A. +1.834 Decl. +1.071
 for a total 2.049 deg

ibex_rotate -o -u 0.639493,0.709283,0.296592 -w ibex-sun -t 2022/05:13:07:37:37
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.639493,+0.709283,+0.296592
 which is R.A. +47.962 Decl. +17.253
 missing R.A. +49.862 Decl. +18.342 (ibex-sun)
 error is R.A. +1.900 Decl. +1.089
 for a total 2.112 deg

ibex_rotate -o -u 0.639493,0.709283,0.296592 -w ibex-sun -t 2022/05:17:15:03:08
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.639493,+0.709283,+0.296592
 which is R.A. +47.962 Decl. +17.253
 missing R.A. +54.105 Decl. +19.367 (ibex-sun)
 error is R.A. +6.143 Decl. +2.114
 for a total 6.202 deg

The inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 568 apogee:

ibex_rotate -o -u 0.579312,0.75141,0.315881 -w ibex-sun -t 2022/05:18:03:26:22
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.579312,+0.751410,+0.315881
 which is R.A. +52.369 Decl. +18.414
 missing R.A. +54.586 Decl. +19.452 (ibex-sun)
 error is R.A. +2.217 Decl. +1.038
 for a total 2.339 deg

ibex_rotate -o -u 0.579312,0.75141,0.315881 -w ibex-sun -t 2022-05-22T12:39:47.659Z
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
 points axis +1.000000,+0.000000,+0.000000
 towards ECI +0.579312,+0.751410,+0.315881
 which is R.A. +52.369 Decl. +18.414
 missing R.A. +59.002 Decl. +20.396 (ibex-sun)
 error is R.A. +6.633 Decl. +1.982
 for a total 6.562 deg

 Lo Normal mode for the entire orbit.

There is no overlap with orbit 566 commands by manual inspection or by checking at


Command Approval Checklist is attached.

Ken

On 04/25/2022 2:44 PM Perry, Timothy E [US] (SP) <timothy.perry@ngc.com> wrote:


All, 

   Attached are the planning files for Orbit #567. Please respond to this thread with comments and approvals.   

Approvals are required by 1800, 29 April 2022 

  

Please note the following: 

  1. Battery Balancing this orbit 

Begin 2022/05/17 23:00:00– End 2022/05/18 00:30:00 

  1. Since the inertial maneuver was an hour after perigee, the battery balancing could not be planned for the normal perigee time. I found a quiet period between the first perigee contact and the beginning of the maneuver. 


  2. Command Load Constraint Violation Report (CCVR) 

IBEX_2022_129_o0567a_v001.ccvr 

# Input files:        

#   IBEX_2022_129_o0567a_v001.scr 


========================== 

HARD CONSTRAINT VIOLATIONS 

========================== 

NO VIOLATIONS. 


========================== 

SOFT CONSTRAINT VIOLATIONS 

========================== 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/05/09 13:10:21 UTC 

IBX-CLC-016: No command to enable spin pulse protection was found after 

             transition to science mode at 2022/05/13 07:07:37 UTC 


============== 

OTHER MESSAGES 

============== 

NO MESSAGES.