All,
Attached are the planning files for Orbit #559. Please respond to this thread with comments and approvals.
Approvals are required by COB, 15 Feb 2022
Please note the following:
Begin 2022/03/06 12:00:00 – End 2022/03/06 13:30:00
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2022_056_o0559a_v001.ccvr
# Input files: 1
# IBEX_2022_056_o0559a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
The 2 IBX-CLC-006 violations are acceptable
IBX-CLC-006: Planned transmission at 2022/03/06 09:13:00 UTC - 2022/03/06
10:17:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2022/03/06 13:58:00 UTC - 2022/03/06
15:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/02/25 12:05:43 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2022/03/01 14:19:42 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430