All,
Attached are the planning files for Orbit #552. Please respond to this thread with comments and approvals.
Approvals are required by COB, 12 Dec 2021
Please note the following:
Begin 12/31/2021 19:00:00– End 12/31/2021 20:30:00
3.
Command Load Constraint Violation Report (CCVR)
# Filename: IBEX_2021_356_o0552a_v001.ccvr
# File type: Command Load Constraint Violation Report (CCVR)
#
# Create time: 2021/343.164915
# Plan period start: 2021/356.220000
# Plan period stop: 2022/001.023000
# Default time format: UTC
#
# Input files: 1
# IBEX_2021_35_o0552a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
These IBX-CLC-006 soft constraint violations areacceptable
IBX-CLC-006: Planned transmission at 2021/12/22 22:28:00 UTC - 2021/12/22
23:32:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2021/12/23 01:58:00 UTC - 2021/12/23
03:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/12/22 22:45:03 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/12/27 06:30:07 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430